Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

Boiler Controls Update at the Public Safety Building
Renovation
Bidding
$400,000 CJ est. value
Kenosha, WI 53140

Boiler Replacement
Renovation
Sub-Bidding
$292,100 CJ est. value
Camp Douglas, WI 54618

South Housing Ventilation Upgrades - Prairie Du Chien Correctional Institution (Department of Corrections)
Renovation
Sub-Bidding
$145,500 CJ est. value
Prairie du Chien, WI 53821

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

HVAC Renovations - Fond Du Lac County Government Center
Alteration
Post-Bid
Fond du Lac, WI 54935

HVAC Upgrades Fire Station 2 and Fire Station 3
Results
Appleton, WI 54915

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Results
$1,247,800 est. value
Madison, WI 53704

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Levis Water Heater Replacement
Renovation
Construction
$79,550 CJ est. value
Black River Falls, WI 54615

Repair HVAC to Address Humidity Issues in Building B1796
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Fort McCoy, WI 54656

Refurbish Marley Cooling Tower
Alteration
Post-Bid
Madison, WI 53704

Fountain City Service Base HVAC Return Duct
Term Contract
Results
Less than $25,000 est. value
Fountain City, WI 54629

AHU Replacement Hilltop Center University of Wisconsin-Eau Claire
Renovation
Construction
$254,479 CJ est. value
Eau Claire, WI 54701

Hydronic Heating Improvement
Renovation
Sub-Bidding
$300,000 CJ est. value
Waupun, WI 53963

Last Updated 05/08/2023 03:18 PM
Project Title

Water Resource Recovery Facilities Boiler Upgrade 2022

Physical Address View project details and contacts
City, State (County) Platteville, WI 53818   (Grant County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $469,362 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes but is not limited to the following items at the City of Platteville Water Resource Recovery Facility: removal of existing pneumatic temperature control systems for filter building, digester building, main building, below grade connection tunnel "A" and tunnel "B"; removal and replacement of existing valve body and valve actuators on terminal heat devices and heating coils, removal and replacement of new condensing boiler and appurtenances; HVAC upgrades and electrical upgrades per Contract Drawings. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1702 Pankratz Street, Madison, WI 53704The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. Question Deadline 03/17/2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents