Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Costa Verde Commercial Shopping Center Revitalization
Addition, Demolition, New Construction, Renovation, Infrastructure - 360,000 SF
Design
$170,000,000 CJ est. value
San Diego, CA 92122

Costa Verde Commercial Shopping Center Revitalization
Addition, Demolition, New Construction, Renovation, Infrastructure - 360,000 SF
Design
$170,000,000 CJ est. value
San Diego, CA 92122

Marine Corps Recruit Depot Female Heads (Restrooms)
New Construction, Infrastructure - 500 SF
Bidding
$1,000,000 CJ est. value
San Diego, CA 92140

San Diego International Airport Terminal 1
New Construction
Post-Bid
$2,265,000,000 est. value
San Diego, CA 92101

City of San Diego East Village Green
New Construction - 80,484 SF
Post-Bid
$48,800,000 est. value
San Diego, CA 92104

SDIA - Airport Administration Building - Site Demolition and Earthwork
Infrastructure
Results
San Diego, CA 92108

Bermuda Avenue Coastal Access Replacement
Infrastructure
Results
$2,132,000 CJ est. value
San Diego, CA 92107

UCSD Theater District Living & Learning Neighborhood
New Construction - 900,000 SF
Construction
San Diego, CA 92037

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Ocean Kamp
New Construction, Infrastructure - 126,400 SF
Pending Verification
$390,000,000 CJ est. value
Oceanside, CA 92054

Bonita Road at Acacia Avenue Drainage - San Diego County
Infrastructure
Conception
$5,925,000 CJ est. value
Bonita, CA 91902

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

Last Updated 03/06/2023 03:05 PM
Project Title

Healthpeak Callan-Ridge (Turning Point Therapeutics Inc Headquarters)

Physical Address View project details and contacts
City, State (County) San Diego, CA 92121   (San Diego County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Parking Garage, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $18,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of existing buildings and the construction of two life-science buildings. As of March 6, 2023, a building permit has been issued for the project. The General Contractor has not been identified. A firm construction timeline has not yet been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, 149,060 SF. 2 Stories Below Grade, Demolition, Demolition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents