Similar Projects
DDPO Installation Data Drops and Power Outlet (DDPO) Installation
Renovation
Design
$1,000,000 CJ est. value
Chicago, IL 60612

CSSC Cooling System Upgrade
Renovation
Design
$500,000 CJ est. value
Lemont, IL 60439

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Various Small Construction Projects within the Boundaries of Great Lakes and Ohio River Divisions
Renovation, Addition, Demolition, Term Contract
Results
Less than $90,000,000 est. value
Chicago, IL - Louisville, KY - Detroit, MI - Allegany, Buffalo, NY - Nashville, TN - Huntington, WV

GSA - DOS Carpet and Paint at JCK Federal Building
Renovation, Term Contract
Results
Chicago, IL 60604

Update Wayfinding Signage
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Hines, IL 60141

Elevator Inspection And Maintenance Services
Term Contract
Post-Bid
Rantoul, IL

Replace Roofing Systems
Alteration
Results
Less than $400,000 est. value
Quincy, IL 62301

Renovate Basement to Support Unit Stationing Urbana Readiness Center - General
Renovation
Post-Bid
$800,000 est. value
Urbana, IL 61802

Captain James A. Lovell Federal Health Care Center Renovate Building 5
Renovation
Post-Bid
$10,000,000 CJ est. value
North Chicago, IL 60064

P-828 Smart Energy, Great Lakes
Renovation
Post-Bid
$10,000,000 CJ est. value
North Chicago, IL 60088

RFQ Contractor - Mechanical and Electrical Systems Upgrade at Chicago TRACON
Renovation
Post-Bid
$10,000,000 CJ est. value
Elgin, IL 60123

Last Updated 12/20/2022 03:03 AM
Project Title

Upgrade Vehicle Exhaust, Replace Roofs, HVAC, and Windows Readiness Center Building Vehicle Maintenance Shop - Rebid

Physical Address View project details and contacts
City, State (County) Milan, IL 61264   (Rock Island County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,822,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope ofWork provides for replacement of existing roofing and associated sheet metal and trim, including gutters, downspouts, and trim, and vertical access ladders at both buildings, replacement of existing insulated glass units with broken seals, at both buildings, replacement of broken/cracked brick or CMU veneer, and select tuckpointing, and control joint sealant, at both buildings, and replacement of existing roof exhaust fans at both buildings. Replacement of existing glass-block windows of the Readiness Center, with fixed aluminum windows at upper Multi-Purpose Room, and replacement of vehicle exhaust system and tube heater systems at Vehicle Maintenance Building PLA is required for this project. This is a Single Prime Delivery Method project.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents