Similar Projects
11 Faneuil Street
New Construction - 43,820 SF
Design
$13,500,000 est. value
Brighton, MA 02135

3326 Washington Street
New Construction - 40,450 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Jamaica Plain, MA

Planet Fitness
Renovation - 15,654 SF
Post-Bid
West Roxbury, MA 02132

Miranda-Creamer/South End Fitness Center Repairs
Results
Less than $3,300,000 est. value
Boston, MA 02108

Costello Basketball Suite Project - General Bid
Renovation - 12,000 SF
Results
Less than $3,000,000 est. value
Lowell, MA

Two Drydock Office Building
New Construction - 230,000 SF
Construction
$128,000,000 est. value
Boston, MA

The Ceintures
New Construction - 78,432 SF
Construction
$11,000,000 est. value
South Boston, MA 02127

Hilton Hotel
New Construction - 151,235 SF
Pending Verification
$10,000,000 CJ est. value
Boston, MA

Sharon Gallery
New Construction - 984,117 SF
Pending Verification
$142,822,000 est. value
Sharon, MA

Norman Street Residences
New Construction - 650,000 SF
Design
$10,000,000 CJ est. value
Everett, MA

Fitness Center Infrastructure Upgrades - Phase 1A for Mount Wachusett Community College - Filed Sub-Bids
Renovation
Results
$2,678,890 est. value
Gardner, MA 01440

37-43 North Beacon Street
New Construction - 87,484 SF
Construction
$30,000,000 est. value
Allston, MA 02100

1700-1710 Dorchester Avenue
New Construction - 96,394 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Dorchester, MA 02122

Roxbury Preparatory Charter High School
New Construction, Demolition - 49,520 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Roslindale, MA 02132

The Salvation Army Kroc Corps Community Center
Renovation, Addition - 6,000 SF
Construction
Boston, MA

Last Updated 04/08/2021 10:20 AM
Project Title

Fitness Center Infrastructure Upgrades - Phase 1A for Mount Wachusett Community College - General Bids

Physical Address View project details and contacts
City, State (County) Gardner, MA 01440   (Worcester County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,678,890
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. The project consists of the replacement of major HVAC equipment, emergency generator and related work.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Packaged Generator Assemblies, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents