Similar Projects
Maryville School Lift Station Replacement
New Construction, Infrastructure
Bidding
Georgetown, SC 29440

Pre-Engineered Duplex Pump Station
New Construction, Infrastructure
Bidding
Pageland, SC 29728

Central Plant Pump Station Motor Replacement
Post-Bid
Conway, SC 29526

Pump Station 7 Repairs
Post-Bid
$100,000 to $300,000 est. value
Hollywood, SC 29449

Construction of the Pump Station Upgrades
Results
Johnsonville, SC 29555

Pump Station #153 Control Panel Replacement
Results
Andrews, SC 29510

Pacolet Mills 2 Pump Station Rehabilitation Project
Renovation
Bidding
$220,000 est. value
Pacolet, SC 29372

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

McRae Road Pump Station Upgrade
Results
Camden, SC 29020

Brunson Pump Station Modifications and Sewer Rehabilitation Division I Pump Station Modifications
Renovation
Bidding
Brunson, SC

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

Burger King Pump Station Replacement
Results
Greenville, SC 29607

Buchanan Bridge Pump Station and Force Main
Renovation
Post-Bid
Less than $400,000 est. value
Chesterfield, SC

Quail Creek/Garners Ferry Lift Station Pumps
Results
Columbia, SC 29204

O Dell Street Lift Station and Sewer Line
Infrastructure
Post-Bid
Liberty, SC 29657

Last Updated 12/03/2021 02:02 AM
Project Title

WWTF Modifications

Physical Address View project details and contacts
City, State (County) Lyman, SC   (Spartanburg County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of upgrades: Install new 85-foot diameter clarifier. Replace existing sludge pumps with new pumps in new dry pit pump station. Install new pumps in an existing wetwell to pump decant from the sludge thickener and process water from the existing belt press. Replace existing 8-inch RAS line with 14-inch. Improvements and modifications to two existing 85-foot diameter clarifiers.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents