Similar Projects
Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

Ushers Road Medical Building
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Ballston Lake, NY 12019

Playground Upgrades, Clement Park
Infrastructure
Design
$190,000 CJ est. value
Waterford, NY 12188

Raw Water Source Dam and Transmission Improvements Contract No 1 and Contract No 2
Infrastructure
Bidding
$200,000 CJ est. value
Mechanicville, NY 12118

General Excavation Services
Infrastructure
Post-Bid
Ballston Spa, NY

Galway Central School District 2021 Capital Project - Contract No. 01 - Site Contract (SC)
Infrastructure
Post-Bid
$10,000,000 est. value
Galway, NY

World-Wide Water Storage Tank Remediation
Term Contract
Results

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Results
Less than $225,000 est. value
Round Lake, NY 12151

Tribley Active Adult Community PDD
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Mechanicville, NY 12118

Blue Barns Solar Development
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Clifton Park, NY 12148

Olde Saratoga Brewing Plant Redevelopment
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Saratoga Springs, NY 12866

Button Road Water Storage Tank Project - Contract 1G - General Construction
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Halfmoon, NY 12065

Hudson River Maintenance Dredging; Port of Coeymans Dredge Area
Infrastructure
Results
$10,000,000 CJ est. value
Waterford, NY 12188

Chloe's Place Development
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saratoga Springs, NY 12866

Saratoga Springs YMCA Expansion
Addition, Demolition, Infrastructure - 34,000 SF
Design
$5,000,000 CJ est. value
Saratoga Springs, NY 12866

Last Updated 08/05/2022 01:02 PM
Project Title

Riverside Tank Demolition Town of Stillwater

Physical Address View project details and contacts
City, State (County) Stillwater, NY 12170   (Saratoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $649,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use. Additional copies of the Bidding Documents may be purchased at the following non-refundable prices: Additional complete set, per set $100.00 Individual Drawings, per pages $5.00 ($5.00 min.) Individual Pages of Manual, per page $0.14 ($5.00 min.) Town of Stillwater, Demolition of 200,000 gallon Riverside Water Storage Tank. Work shall include, but is not limited to, demolition of the welded streel water storage tank, removal of tank material from the site, environmental controls and tank foundation removal as an add alternate. All restoration work will be performed by the Town. The Project shall be completed on or before November 15, 2022, and completed and ready for final payment on or before November 30, 2022. Bids will be received for a single prime Contract. Bids will be received on an itemized unit price basis, with alternates. Bids should not include sales and compensating use taxes on materials incorporated into the work. Bids actually received by mail or by hand after the appointed time on the date specified shall be rejected, notwithstanding that such Bid may have been placed in a mail box or other mail receptacle regularly maintained by the United States Postal Service before such time, and ordinarily in sufficient time to have been delivered on time. Bid security in the amount of 5% of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidder will be required to furnish a performance bond and a payment bond, each in an amount equal to 100% of the contract price. There will not be a Pre-bid Conference. The Town of Stillwater reserves the right to waive any informalities or irregularities in the Bids received, or to reject any or all Bids without explanation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents