Similar Projects
Hardwood Synthetic Sports Flooring
Post-Bid

Miramar`s Regional Park Aquatics Rest Room and Break Room Flooring Project
Post-Bid
Miramar, FL 33027

Fire Stations No. 3 and 6 Flooring
Alteration
Results
Plantation, FL 33325

Sunset Lakes Community Center Flooring Project
Post-Bid
Miramar, FL 33029

56--ACFT Artificial Turf Field
Post-Bid
Miramar, FL

Fire Station Apparatus Bay Floor Resurfacing
Post-Bid
Sunrise, FL 33326

WWTP Process Area Floor Coating Project
Post-Bid
Miramar, FL 33025

CoverTec Surfacing Protective System
Post-Bid
Plantation, FL

Floor Resurfacing Project For Fire Stations
Post-Bid
$70,000 est. value
Pembroke Pines, FL

Multi-Service Center LVT Flooring Installation
Alteration
Post-Bid
Miramar, FL 33023

Miramar Youth Enrichmentcenter and Vizcaya Park Supervisor Office Flooring Project
Alteration
Post-Bid
Miramar, FL 33023

Vizcaya Park Office Area, Concession Area and Break Room Flooring Project
Alteration
Post-Bid
Miramar, FL 33029

Maintenance of Hardwood Floors
Term Contract
Post-Bid
FL

Vizcaya Park Lobby Flooring Project
Alteration
Post-Bid
Miramar, FL 33029

Vinyl Composition Tiles (VCT) for Fiveash WTP
Alteration
Post-Bid
Fort Lauderdale, FL

Reported 12/30/2021 12:00 AM
Project Title

GTL Hybrid Flooring Refinish

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33316   (Broward County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Prepare concrete floors using Steel Shot Blast and Dustless Grinding Preparation. Any existing coating that prevents a smooth surface in the finished product must be removed. Uneven final floor surfaces will be rejected and required to be refinished. Install a solid gray color, hybrid floor system consisting of cementitious urethane base coat and epoxy and urethane topcoats. Natural quartz aggregate is incorporated for improved slip resistance. The nominal system thickness is 3/16 - 1/4 inch. Contractor to submit product data sheet for approval. Compressive strength to meet 17,500 psi per ASTM D-695 and Hardness of 75-80 per ASTM D-2240. The total of work areas is estimated at 2,300 square feet divided between 4 buildings. This includes 2 stairwells

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents