Similar Projects
West Walnut Street Redevelopment
Bidding
Johnson City, TN 37604

Paving Certain Streets within the City
Bidding
Rogersville, TN

Blanket Contract for Parking Lot Seal Coating and Repairs
Post-Bid
Chattanooga, TN

Concrete Sidewalk Grinding Services
Term Contract
Post-Bid
Chattanooga, TN 37402

Shallowford Bonnie Way Sidewalk
Results
Less than $705,222 est. value
Chattanooga, TN

Caine Lane Greenway
Results
Less than $712,713 est. value
Chattanooga, TN 37400

Cold Milling of Asphalt
Term Contract
Bidding
Crossville, TN

2019 Citywide Resurfacing Contract
Post-Bid
Chattanooga, TN 37402

UTC West Campus Housing Pedestrian Plaza
Results
Chattanooga, TN

Arlington Bike and Pedestrian Trail
Bidding
Arlington, TN 38002

Milling and Resurfacing of Two Existing Roadways
Post-Bid
Chattanooga, TN 37400

The Resurfacing on I-24 from the Georgia State Line
Results
TN

Lee Victory Recreational Park Entrance Road
Bidding
Smyrna, TN

FY20 Sidewalks Contract
Post-Bid
Chattanooga, TN 37402

The On-Call Concrete Pavement Repair
Results
TN

Last Updated 04/13/2021 11:42 AM
Project Title

Conference Drive Enhancements

Physical Address View project details and contacts
City, State (County) Goodlettsville, TN 37072   (Davidson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements on Conference Drive at Mission Ridge Drive have been planned the City of Goodlettsville to improve the form and function along with the overall amenity of the project area. The project will rehabilitate sidewalks, landscaping and crosswalks, and create an enhanced entry point into the City of Goodlettsville. This project will include work at the intersection of Conference Drive and Mission Ridge Drive with a total project length of 320 feet. The project will include the establishment of an island on the south side of the intersection creating a pedestrian safe-haven as well as modifying the existing median on the north side of the intersection. Each median will have improved landscaping along with additional plantings around the outside of the new sidewalks.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents