Similar Projects
I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Asphalt Rejuvenation Project
Results
$66,430 est. value
Milton, GA 30004

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Maintenance Agreement for Permeable Pavers
Post-Bid
Atlanta, GA

T32-D7-Pavepres-SR 139 6-9-111011
Results
GA

Street Sweeping
Post-Bid
Alpharetta, GA

Water Meters
Term Contract
Results
$750,000 est. value
Atlanta, GA 30303

T32-D7-PCC-I85 I75 Split SB-119952
Infrastructure
Post-Bid
GA

Last Updated 07/28/2022 11:03 AM
Project Title

Tommy Lee Cook Road and Alpine Way Storm Drain Replacement project

Physical Address View project details and contacts
City, State (County) Palmetto, GA 30268   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $335,197 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28, 2022, project was awarded to Wilson Construction Management LLC, awarded amount is $335,197.20. The Project consists of furnishing all materials, labor, and equipment for the replacement of an existing storm drain system that runs along Tommy Lee Cook Road at the intersection with Alpine Way in the City of Palmetto, Georgia. Work required for the project includes, but is not limited to, full depth asphalt pavement construction, asphalt pavement overlay, asphalt mill and inlay, storm drain system placement and construction, curb and gutter, concrete driveway, concrete pavement widening, signing, and marking, erosion control, traffic control, utility coordination, and sanitary sewer relocation and installation. All materials and workmanship shall meet or exceed Georgia Department of Transportation Construction Standards and Specifications and comply with all State, Federal, and local regulations, and ordinances. Bids will be received for a single prime Contract A Pre-Bid Conference will not be conducted at this time

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents