Similar Projects
Dowd Junction Lift Station 4 and Force Main Replacement
New Construction, Alteration
Bidding
Eagle, CO

Booster 2 Pump Station Upgrade
New Construction, Renovation - 2,500 SF
Bidding
Colorado Springs, CO 80911

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Lift Station Valve Assembly Construction
Results
Less than $122,000 est. value
Falcon, CO

Firestone Horizontal Well (FAST) Pump Station Project
New Construction
Bidding
Longmont, CO 80504

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Post-Bid
Longmont, Lyons, CO 80540

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

Gold Creek Lift Station Project
New Construction, Renovation
Bidding
Elizabeth, CO

Quail Dunes Golf Course Pump Station Replacement
New Construction, Infrastructure
Post-Bid
Fort Morgan, CO

Washington Street Stormwater Lift Station
Results
Less than $530,750 est. value
Lamar, CO 81052

On-Call Lift and Booster Pump Station Maintenance
Term Contract
Results
Brighton, CO 80601

Northern Water Supply Project North Booster Pump Station (NBPS) Overflow Channel Project
Results
Aurora, CO 80016

Clarkson Pump Station
Results
Denver, CO 80204

Reported 03/11/2022 12:00 AM
Project Title

CMAR Non-Potable Irrigation Pump Stations

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The CMAR will cooperate with the Owner and Design Engineer providing the Phase 1 and Phase 2 in a timely manner to complete the Project scope specified in this RFP. CMAR responsibilities include: • Participation in Design Review Workshops and construction progress meetings. • Collaborate with Owner and Design Engineer as required to meet project objectives. • Prepare construction package and distribute construction package to subcontractors and suppliers. • Supervise subcontractors and CMAR personnel. • Obtain certain governmental approvals and permits for construction purposes only. • Maintain site security and safety. • Conduct performance and acceptance testing. • Implement quality-management procedures. • Implement project health and safety practices. • Warranty guarantees and insurance. • Perform risk management and mitigation activities. • Establish and maintain Change Order Management Plan.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents