Similar Projects
Armor Joint Repairs and Joint Sealing on Various Roads and Bridges, Precinct 3
Results
Houston, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

2019-2020 Microsurface Toc Package 1
Results
$3,000,000 est. value
San Antonio, TX

Harvest Townside Phase 2 Paving
Results
TX

Harvest Townside Phase 2 Mass Grading
Results
TX

Southern Region Disaster Recovery Support BPA
Results

Last Updated 04/09/2020 08:15 AM
Project Title

GR, STR, ACP Base and Surf, Pv Mk

Physical Address View project details and contacts
City, State (County) TX   (Gregg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,228,264
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 93.810 1 104 6009 Removing Conc (Riprap) Sy 213.000 2 104 6017 Removing Conc (Driveways) Sy 3,534.000 3 104 6022 Removing Conc (Curb And Gutter) Lf 3,507.000 4 104 6064 Removing Conc (Misc) Cy 581.000 5 105 6008 Removing Stab Base And Asph Pav (6") Sy 39,553.000 6 110 6001 Excavation (Roadway) Cy 57,605.000 7 110 6003 Excavation (Special) Cy 700.000 8 132 6006 Embankment (Final)(Dens Cont)(Ty c) Cy 24,431.000 9 160 6003 Furnishing And Placing Topsoil (4") Sy 49,942.000 10 162 6002 Block Sodding Sy 49,942.000 11 164 6029 Cell Fbr Mlch Seed(Temp)(Warm) Sy 24,971.000 12 164 6031 Cell Fbr Mlch Seed(Temp)(Cool) Sy 24,971.000 13 164 6055 Bonded Fbr Mtrx Seed (Temp)(Warm) Sy 24,971.000 14 164 6056 Bonded Fbr Mtrx Seed (Temp)(Cool) Sy 24,971.000 15 168 6001 Vegetative Watering Mg 1,648.000 16 247 6231 Fl Bs (Cmp In Place)(Ty a Gr 1-2)(10") Sy 61,175.000 17 260 6001 Lime (Hydrated Lime (Dry)) Ton 496.000 18 260 6027 Lime Trt (Exst Matl)(8") Sy 31,017.000 19 275 6001 Cement Ton 496.000 20 275 6011 Cement Treat(Exist Matl)(8") Sy 31,017.000 21 310 6021 Prime Coat & Blotter (Mc-30) Gal 18,094.000 22 316 6406 Asph (Ac-20xp, Ac-10-2tr, Or Ac-20-5tr) Gal 52,476.000 23 316 6407 Aggr (Ty-Pd Gr-3 Or Ty-Pl Gr-3) Cy 1,250.000 24 341 6010 d-Gr Hma Ty-b Pg70-22 Ton 3,387.000 25 341 6028 d-Gr Hma Ty-c Pg70-22 Ton 520.000 26 341 6080 d-Gr Hma Ty-b Pg64-22(Level-Up) Ton 3,943.000 27 354 6021 Plane Asph Conc Pav(0" To 2") Sy 2,597.000 28 400 6006 Cut & Restoring Pav Sy 425.000 29 401 6001 Flowable Backfill Cy 467.000 30 402 6001 Trench Excavation Protection Lf 9,837.000 31 403 6001 Temporary Spl Shoring Sf 11,022.000 32 416 6032 Drill Shaft (Trf Sig Pole) (36 In) Lf 26.000 33 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 44.000 34 420 6009 Cl a Conc (Collar) Ea 1.000 35 432 6024 Riprap (Stone Common)(Dry)(12 In) Cy 100.000 36 462 6001 Conc Box Culv (3 Ft x 2 Ft) Lf 519.000 37 462 6004 Conc Box Culv (4 Ft x 3 Ft) Lf 779.000 38 462 6005 Conc Box Culv (4 Ft x 4 Ft) Lf 120.000 39 462 6007 Conc Box Culv (5 Ft x 3 Ft) Lf 206.000 40 462 6008 Conc Box Culv (5 Ft x 4 Ft) Lf 120.000 41 462 6010 Conc Box Culv (6 Ft x 3 Ft) Lf 3,605.000 42 462 6011 Conc Box Culv (6 Ft x 4 Ft) Lf 503.000 43 462 6012 Conc Box Culv (6 Ft x 5 Ft) Lf 174.000 44 462 6014 Conc Box Culv (7 Ft x 3 Ft) Lf 1,241.000 45 462 6016 Conc Box Culv (7 Ft x 5 Ft) Lf 174.000 46 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 4,222.000 47 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 63.000 48 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 467.000 49 464 6018 Rc Pipe (Cl Iv)(24 In) Lf 101.000 50 464 6020 Rc Pipe (Cl Iv)(36 In) Lf 103.000 51 464 6026 Rc Pipe (Cl v)(24 In) Lf 180.000 52 465 6009 Jctbox(Compl)(Pjb)(5ftx5ft) Ea 19.000 53 465 6162 Inlet(Compl)(Pazd)(Fg)(5ftx5ft-4ftx4ft) Ea 8.000 54 465 6549 Inlet (Compl)(Curb)(5ft)(None) Ea 9.000 55 465 6550 Inlet (Compl)(Curb)(5ft)(Left) Ea 2.000 56 465 6551 Inlet (Compl)(Curb)(5ft)(Left-Left) Ea 26.000 57 465 6552 Inlet (Compl)(Curb)(5ft)(Right) Ea 6.000 58 465 6553 Inlet (Compl)(Curb)(5ft)(Right-Right) Ea 19.000 59 465 6554 Inlet (Compl)(Curb)(5ft)(Both) Ea 8.000 60 466 6097 Headwall (Ch - Pw - 0) (Dia= 24 In) Ea 3.000 61 466 6101 Headwall (Ch - Pw - 0) (Dia= 36 In) Ea 1.000 62 466 6130 Headwall (Ch - Pw - s) (Dia= 24 In) Ea 1.000 63 466 6193 Wingwall (Pw - 2) (Hw=4 Ft) Ea 4.000 64 466 6194 Wingwall (Pw - 2) (Hw=5 Ft) Ea 2.000 65 466 6197 Wingwall (Pw - 2) (Hw=8 Ft) Ea 2.000 66 467 6390 Set (Ty Ii) (24 In) (Rcp) (4: 1) (c) Ea 1.000 67 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (p) Ea 6.000 68 496 6001 Remov Str (Box Culvert) Ea 1.000 69 496 6002 Remov Str (Inlet) Ea 5.000 70 496 6004 Remov Str (Set) Ea 11.000 71 496 6005 Remov Str (Wingwall) Ea 7.000 72 496 6016 Remov Str (Pipe) Ea 13.000 73 496 6023 Remove Str (Junction Box) Ea 1.000 74 496 6050 Remov Str (Driveway Culvert) Ea 64.000 75 500 6001 Mobilization Ls 1.000 76 502 6001 Barricades, Signs And Traffic Handling Mo 19.000 77 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 1,448.000 78 506 6011 Rock Filter Dams (Remove) Lf 1,448.000 79 506 6020 Construction Exits (Install) (Ty 1) Sy 213.000 80 506 6024 Construction Exits (Remove) Sy 213.000 81 506 6030 Backhoe Work (Erosion & Sedmt Cont) Hr 150.000 82 506 6035 Sandbags For Erosion Control Ea 8.000 83 506 6038 Temp Sedmt Cont Fence (Install) Lf 9,680.000 84 506 6039 Temp Sedmt Cont Fence (Remove) Lf 9,680.000 85 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 1,330.000 86 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 175.000 87 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,505.000 88 506 6046 Trackhoe Work (Erosion & Sedmt Cont) Hr 200.000 89 508 6003 Constructing Detours (Ty 1) Sy 13,370.000 90 508 6004 Constructing Detours (Ty 2) Sy 309.000 91 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 120.000 92 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 80.000 93 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 360.000 94 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 240.000 95 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 120.000 96 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 80.000 97 529 6008 Conc Curb & Gutter (Ty Ii) Lf 16,648.000 98 530 6002 Intersections (Acp) Sy 9,006.000 99 530 6005 Driveways (Acp) Sy 3,601.000 100 530 6017 Driveways (Conc) (Hes) Sy 4,439.000 101 531 6001 Conc Sidewalks (4") Sy 11,712.000 102 531 6004 Curb Ramps (Ty 1) Ea 5.000 103 531 6010 Curb Ramps (Ty 7) Ea 30.000 104 531 6016 Curb Ramps (Ty 21) Ea 1.000 105 531 6017 Curb Ramps (Ty 22) Ea 1.000 106 536 6002 Conc Median Sy 722.000 107 536 6004 Conc Directional Island Sy 73.000 108 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 200.000 109 542 6001 Remove Metal Beam Guard Fence Lf 1,201.000 110 544 6003 Guardrail End Treatment (Remove) Ea 16.000 111 560 6004 Mailbox Install-s (Twg-Post) Ty 2 Ea 28.000 112 560 6005 Mailbox Install-d (Twg-Post) Ty 2 Ea 1.000 113 560 6006 Mailbox Install-m (Twg-Post) Ty 2 Ea 1.000 114 618 6029 Condt (Pvc) (Sch 40) (3") Lf 355.000 115 618 6033 Condt (Pvc) (Sch 40) (4") Lf 34.000 116 618 6054 Condt (Pvc) (Sch 80) (3") (Bore) Lf 271.000 117 620 6004 Elec Condr (No.12) Insulated Lf 510.000 118 620 6008 Elec Condr (No.8) Insulated Lf 1,310.000 119 620 6009 Elec Condr (No.6) Bare Lf 569.000 120 620 6010 Elec Condr (No.6) Insulated Lf 180.000 121 624 6002 Ground Box Ty a (122311)w/Apron Ea 3.000 122 624 6010 Ground Box Ty d (162922)w/Apron Ea 2.000 123 628 6118 Elc Srv Ty d 120/240 060(Ns)Al(e)Tp(o) Ea 1.000 124 644 6002 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p-Bm) Ea 1.000 125 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(u) Ea 2.000 126 644 6036 In Sm Rd Sn Sup&Am Tys80(1)Sa(u-Bm) Ea 1.000 127 644 6060 In Sm Rd Sn Sup&Am Tytwt(1)Ws(p) Ea 42.000 128 644 6075 Relocate Sm Rd Sn Sup&Am(Sign Only) Ea 1.000 129 644 6076 Remove Sm Rd Sn Sup&Am Ea 45.000 130 662 6001 Wk Zn Pav Mrk Non-Remov (w)4"(Brk) Lf 112.000 131 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 59,140.000 132 662 6016 Wk Zn Pav Mrk Non-Remov (w)24"(Sld) Lf 36.000 133 662 6032 Wk Zn Pav Mrk Non-Remov (y)4"(Brk) Lf 104.000 134 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 59,174.000 135 662 6050 Wk Zn Pav Mrk Remov (Refl) Ty Ii-a-a Ea 5.000 136 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 312.000 137 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty y-2 Ea 1,216.000 138 662 6112 Wk Zn Pav Mrk Sht Term Rmv (w)(4") Lf 500.000 139 662 6113 Wk Zn Pav Mrk Sht Term Rmv (y)(4") Lf 500.000 140 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 48.000 141 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 1,705.000 142 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 1,123.000 143 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 4,155.000 144 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 1,471.000 145 666 6312 Re Pm w/Ret Req Ty i (y)4"(Brk)(100mil) Lf 3,410.000 146 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 19,202.000 147 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 24.000 148 668 6078 Prefab Pav Mrk Ty c (w) (Dbl Arrow) Ea 2.000 149 668 6085 Prefab Pav Mrk Ty c (w) (Word) Ea 9.000 150 672 6007 Refl Pav Mrkr Ty i-c Ea 274.000 151 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 449.000 152 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 41,025.000 153 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 36.000 154 680 6002 Install Hwy Trf Sig (Isolated) Ea 1.000 155 682 6001 Veh Sig Sec (12")Led(Grn) Ea 9.000 156 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 5.000 157 682 6003 Veh Sig Sec (12")Led(Yel) Ea 9.000 158 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 4.000 159 682 6005 Veh Sig Sec (12")Led(Red) Ea 9.000 160 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 2.000 161 682 6023 Back Plate (12")(3 Sec) Ea 6.000 162 682 6024 Back Plate (12")(4 Sec) Ea 5.000 163 684 6007 Trf Sig Cbl (Ty a)(12 Awg)(2 Condr) Lf 956.000 164 684 6009 Trf Sig Cbl (Ty a)(12 Awg)(4 Condr) Lf 966.000 165 684 6010 Trf Sig Cbl (Ty a)(12 Awg)(5 Condr) Lf 1,479.000 166 684 6012 Trf Sig Cbl (Ty a)(12 Awg)(7 Condr) Lf 1,297.000 167 686 6039 Ins Trf Sig Pl Am(s)1 Arm(36`)Lum Ea 1.000 168 686 6048 Ins Trf Sig Pl Am(s)1 Arm(44`)Lum&Ilsn Ea 1.000 169 686 6060 Ins Trf Sig Pl Am(s)1 Arm(55`)Lum&Ilsn Ea 2.000 170 688 6001 Ped Detect Push Button (Aps) Ea 6.000 171 3077 6021 Sp Mixes Sp-c Pg70-22 Ton 21,327.000 172 6001 6002 Portable Changeable Message Sign Ea 2.000 173 6058 6001 Bbu System (External Batt Cabinet) Ea 1.000 174 6090 6001 Ilsn (Led) (6 d) Ea 3.000 175 6185 6002 Tma (Stationary) Day 30.000 176 6306 6001 Vivds Prosr Sys Ea 1.000 177 6306 6002 Vivds Cam Assy Fxd Lns Ea 4.000 178 6306 6005 Vivds Cntrl Software Ea 1.000 179 6306 6007 Vivds Cabling Lf 952.000 180

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents