Similar Projects
SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Last Updated 03/30/2020 03:40 PM
Project Title

Marion Street System, Phase 1

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,500,000 to $7,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This storm drainage project extending along Marion Street Corridor from MLK Blvd. to E. 27th Ave. (five city blocks) will connect the upstream end of the 33rd Street Outfall system at MLK Blvd. The majority of the work consists of open cut construction of 8' x 8' concrete boxes and relocation of a 6" waterline. Other areas of work include surface restoration in asphalt paving, in concrete sidewalks, and in curb ramps. Green infrastructure (Streetside Stormwater Planters) is also part of other areas of work to enhance water quality.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents