Similar Projects
Platteville High School Improvements
Renovation - 13,500 SF
Conception
Platteville, WI 53818

Saint Augustine Preparatory Academy Expansion
Addition - 11,000 SF
Design
Milwaukee, WI 53207

K-12 FEMA Safe Room
Addition
Bidding
Abbotsford, WI 54405

Office Renovation
Renovation - 380 SF
Bidding
New Richmond, WI 54017

Parkside Elementary School Bid Package 1
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

FEMA Safe Room & Link
Addition
Post-Bid
Spencer, WI 54479

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

High School Additions and Renovation Bid Package 2
Renovation, Addition
Construction
Clinton, WI

National Heritage Academies
New Construction - 45,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Waukesha, WI 53189

Oshkosh School District Secure Entry
Renovation
Bidding
Oshkosh, WI 54904

Sabish Middle School
Renovation
Post-Bid
Fond du Lac, WI 54935

Hamilton Elementary
Renovation, Addition - 18,000 SF
Results
La Crosse, WI 54601

Wisconsin School Of The Deaf - Elevator Addition
Renovation
Construction
Delavan, WI 53115

Last Updated 01/11/2022 11:12 AM
Project Title

Darlington Elementary - Middle School Cafeteria Expansion

Physical Address View project details and contacts
City, State (County) Darlington, WI 53530   (Lafayette County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager - 12/01/21
Owner View project details and contacts
Architect View project details and contacts
Description

1,700 SF masonry/precast commons addition to the existing elementary school. Trash and dumpsters - Dumpsters will be provided by Hoffman, but all trade contractors are responsible for cleaning up after themselves Fire Stopping - Each trade is responsible for all fire stopping and caulking through any rated walls that they penetrate. Safety - Hoffman will enforce but all safety remains the full responsibility of each contractor and supplier. Each contractor is responsible for protection all adjacent surfaces, and existing finishes to remain. Each contractor to provide penetrations for their work and patching with the same. Contractor to provide equipment and labor to complete demolition as shown on sheet AE-101 notes 1, 2, 4, and 5 Contractor is responsible for all footings, foundations, piers, slabs, and all associate components. Coordinate floor drains, cleanouts, electrical boxes etc with the associated trades Contractor responsible for supply and install of all below grade insulation as shown Contractor is responsible for supply and install of the precast plank as shown on the drawings

Details

Middle/Senior High School, Addition, Elementary School, 1,700 SF Addition.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents