Similar Projects
Y1da--Replace Condensate Tank Design Build DB
Term Contract
Design
$500,000 to $1,000,000 est. value
Gainesville, FL 32608

Construction of Aviation Skid Mounted Fuel System
Alteration
Design
Ochopee, FL

Inspection, Maintenance, and Repair Services for Diesel Fuel Tanks
Infrastructure
Bidding
Sunrise, FL

East Water Treatment Plant Fuel Tank Replacement (Design/Build Project)
Infrastructure
Bidding
Plantation, FL 33317

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Assetworks Fuel System (Fuelfocus), Inspection and Repair
Term Contract
Post-Bid
Less than $95,000 est. value
West Palm Beach, FL 33415

Maintenance, Testing and Repairs of Fuel Systems
Term Contract
Results
Less than $2,700,000 est. value
Orlando, FL 32801

Fuel Tank Repair at Brooksville Operations Center
Results
Brooksville, FL 34604

Upgrading of Fuel Depot at Miramar`s Wastewater Reclamation Facility
Alteration
Bidding
Miramar, FL 33027

Northwest Water Reclamation Facility, Bleach Tank Replacement
Post-Bid
Saint Petersburg, FL 33710

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Results
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

Fuel System Inspection and Maintenance
Term Contract, Infrastructure
Bidding
Orlando, FL

Diesel and Unleaded Fuel Polishing and Tank Cleaning
Post-Bid
Port Saint Lucie, FL

Compressed Natural Gas (CNG) Fast Fill Upgrade
Results
$754,616 est. value
Saint Petersburg, FL

Fuel Tank Replacement at WFSU-TV
Term Contract
Bidding
FL

Last Updated 02/03/2022 01:06 PM
Project Title

South Cross Bayou Digester Gas Flowmeter Installation

Physical Address View project details and contacts
City, State (County) Kenneth City, FL 33709   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $564,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work involves providing and testing four (4) thermal dispersion insertion type gas mass flow meters on existing active digester gas piping with associated valves, electrical, and instrumentation work at the South Cross Bayou Advanced Water Reclamation Facility (SCBAWRF). Two of the flow meters are replacements for existing gas meters serving the pelletizer facility and the waste gas flare. The remaining two meters will monitor output from each of the digesters individually. Also, work includes modifying the catwalk to allow for maintenance access to meters on gas lines near the sludge/gas storage tank and providing two (2) in-line detonation arresters between the digester and gas/sludge holding tank with bypass piping, valves, two (2) jib cranes, and eight (8) sampling ports. Gas sampling via the new sampling ports shall be provided after the new flow meters are operational.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents