Similar Projects
I-19-4714 Roadway and Bridge
New Construction, Infrastructure
Bidding
Itasca, IL 60143

Reconstruct the Intersection of 87th Street and Woodrige Avenue in Woodridge
Infrastructure
Bidding
Woodridge, IL

Crack Sealing Bituminous Pavement
Term Contract
Post-Bid
Addison, IL 60101

20-110 Hot-Mix Asphalt Surface Removal
Term Contract
Post-Bid
Wheaton, IL 60187

2020 Replacement Sidewalk Program
Results
Downers Grove, IL 60515

Plymouth Street Improvement
Results
Villa Park, IL 60181

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

Pavement Reconstruction
Infrastructure
Bidding
Hinsdale, IL

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

2020 Fall Roadway Patching
Results
Downers Grove, IL 60515

(1,562-Ft) Intersection Improvement and Signal Installation
Infrastructure
Bidding
West Chicago, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Mill and Overlay of Various Locations at Dupage Airport
Results
Less than $150,000 est. value
West Chicago, IL 60185

C.H. 31 87th Street at Woodward Avenue
Infrastructure
Bidding
Bolingbrook, Woodridge, IL 60517

General Road Maintenance Work
Post-Bid
Lakewood, IL

Last Updated 01/20/2022 01:28 PM
Project Title

Variable Width Pavement Resurfacing W/ Hot-Mix Asphalt

Physical Address View project details and contacts
City, State (County) Westmont, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Const. Variable Width Pav`r. Resurfacing w/ Hot-Mix Asph. Sruf. Cse., Il9.5, Mix d, n70, (1033 Ton), Incl. 1368 Ton Hma Surf. Cse., Il-9.5, Mix d, n50, 896 Ton Hma Surf. Cse., Il9.5, Mix c, n50, 1566 Ton p Lb Mm Il-4.75, n50, 80 Ton Mix Cr Jts Flangewys, 3812 Sq Yd Erosion Contr. Blanket, 130 Cu Yd Earth Excavation, 9860 Pound Bit. Mat`l. (Tack Coat), 592 Detectable Warnings, 1 l Sum Traffic Control & Protection, Std (701611, 701801), 1 l Sum Construction Layout, Assorted Drainage Appurtenances, Etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents