Similar Projects
Last Updated | 07/12/2023 05:04 PM |
Project Title | East Carolina University Jenkins Art North Building Envelope Repairs |
Physical Address | View project details and contacts |
City, State (County) | Greenville, NC 27858 (Pitt County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,127,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of July 12, 2023 the project is awarded to Daniels & Daniels Construction, awarded amount is $1,127,000. The Work of Project is defined by the Contract Documents and consists of the following 1. The renovation to the existing sawtooth bay construction along the north elevation of the Jenkins Art Building. This renovation includes the removal and replacement of the break metal siding, hollow metal and glass curtain wall frames, and associated sheathing and insulation products. Reconstruction will consist of new structural support framing, cold form metal framed infill, new sheathing and insulation products, new weather barrier, new standing seam metal cladding, and new thermally broken curtain wall systems with insulated glazing units. 2. The construction schedule shall provide this time as an independent activity that occurs sequentially in the construction phase. All contractors shall participate in commissioning these specific building systems in accordance with the project specifications. If retesting of the buildings systems is required due to the fault of the contractor, the contractor shall be responsible for all costs associated with the retesting. 3. Project shall include the removal and abatement of all existing hazardous materials per the Hazardous Materials Assessment Report and Specifications as included within this Specification Manual. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. The Owner reserves the right to reject any or all bids and to waive informalities |
||||||||||||||||||||||||||||||||||||||
Details | 3 Stories Above Grade, 125,504 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |