Similar Projects
Lift and Pump Stations, Water Lines Construction Project Lead, Jarrell, TX 76537 (Williamson County)
Last Updated | 04/14/2022 12:45 PM |
Project Title | 1st Street and Double Creek Lift Station Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Jarrell, TX 76537 (Williamson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work generally includes lift station upgrades and new force main construction. The 1st Street Lift Station submersible pumps are to be replaced within the existing wet well and electrical controls are to be rewired to increase the working depth. New 6” discharge piping and valve vault piping are proposed, along with approximately 2,650 linear feet of new 8” force main are to be constructed. At the Double Creek Lift Station, submersible pumps and controls are also to be replaced, and the outgoing 4" force main is to be extended approximately 690 linear feet to discharge into an existing manhole. The intent of the project is to increase overall pumping capacity of the City’s wastewater system. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |