Similar Projects
Construction Services - Surface Water Supply Project - Central Pump Station and RePump Station
New Construction
Bidding
TX

Lift Station Renewal and Replacement
Renovation
Bidding
$14,324,168 est. value
Houston, TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Wastewater Treatment Plant Number 2 Lift Station to Serve
Results
Less than $2,326,844 est. value
Houston, TX 77002

Booster Pump Replacement
Results

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Sanitary Sewer Lift Station Stuebner Hollow
Results
Houston, TX 77070

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Lift Station No. 2
Results
TX

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

Existing Lift Station Nos. 2 and 3 Electrical Modifications, Generator, and Motor Control Center Replacement
Results
$300,000 est. value
Houston, TX 77040

Katy Townhomes Lift Station
New Construction
Post-Bid
$550,000 est. value
Katy, TX

Morewood Lift Station Conversion
Results
Spring, TX 77383

Bayport Facility Vertical Line Shaft Pump Project
Renovation
Post-Bid
Pasadena, TX 77507

Reported 12/22/2021 12:00 AM
Project Title

Construction of Parkland Village Section 53 - LS Improvements, Recreational Facilities

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Project: 1. Concrete Walks. 2. Entry Monumentation. 3. Supplemental Drainage. 4. Mailbox CBU’s. 5. Landscape & Irrigation.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents