Similar Projects
Gym HVAC Upgrade and Cooling Tower Replacement at Tohickon Middle School - General Construction
Alteration
Bidding
Doylestown, PA 18902

Admin Building HVAC Replacement
Alteration
Bidding
$60,000 est. value
Richboro, PA 18954

Tower Site HVAC Equipment Maintenance
Term Contract
Post-Bid
PA

Air Filter
Post-Bid
Newtown, PA 18940

Air Filter
Results
Newtown, PA

High School North Administration HVAC Replacement
Results
Newtown, PA 18940

Township Administration Building HVAC Renovations - Mechanical Contract
Alteration
Bidding
Warrington, PA 18976

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Repairs, Maintenance, Parts Supplies District Wide
Results
Fallsington, PA 19058

J041--Air Balancing Bldg 21 - PHILA | 642-21-3-583-0692
Term Contract
Bidding
Philadelphia, PA 19104

Poquessing Middle School - Chiller Replacement
Post-Bid
Feasterville, PA 19053

Hood Exhaust Systems Cleaning at Neshaminy Manor
Term Contract
Results
Warrington, PA 18976

Smoke and Fire Damper Corrections
Post-Bid
Warrington, PA 18976

Senior Center HVAC
Results
Bensalem, PA 19020

Exhaust Vent Cleaning Grundy Manor
Alteration
Post-Bid
Telford, PA 18969

Reported 08/03/2021 12:00 AM
Project Title

NAVFAC DB Replace 500 Ton Chiller, Building 3 NSA-P, PA

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19112   (Bucks County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor, material, equipment, supplies and supervision to evaluate the new Chiller configuration to determine if it will fit into the existing mechanical room. If not, the Designer of Responsibility will expand the mechanical room or replace the existing air handler in the mechanical room to the roof as required. The Designer will also design an extension of the primary chilled water line to a point outside the building to allow the hookup of a rental chiller. The work is located at Building 3,Naval Support Activity, Philadelphia, PA.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents