Similar Projects
MnDOT HRTC Mech Sys Maint, Test, Repairs
Term Contract
Bidding
Shoreview, MN 55126

Propane/Air Backup Fuel System Components Replacement
Bidding
$250,000 to $500,000 est. value
Waseca, MN 56093

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Burner Replacement and Cooling Tower Recondition at Anoka Metro Regional Treatment Center
Bidding
$300,000 est. value
Anoka, MN 55303

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Repair Services
Post-Bid
Saint Paul, MN 55106

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Moose Lake Truck Station Campus - Electrical and Mechanical
Post-Bid
Less than $3,250,000 est. value
Moose Lake, MN 55767

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

Repair Buildings 1 and 2 at MVH - Electrical and Mechanical
Results
Less than $230,000 est. value
Hastings, MN 55033

Last Updated 04/09/2021 03:10 PM
Project Title

Chiller and Boiler Water Chemical Treatment Services

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STATEMENT OF WORK- FY21 Veterans Affairs Health Care Systems (VAHCS) Energy Center- Minneapolis, Minnesota Chiller and Boiler Water Treatment Chemical Water Treatment Supplies and Services Introduction: The chemical water treatment contractor shall provide all supplies and technical advisory services for proper chemical treatment of all boiler and chiller water systems located at the Minneapolis VA Health Care facility. VAHCS Energy Center employees shall be responsible for continuous feeding of chemicals and performing water tests with oversight by the contractor. In addition, the contractor shall periodically verify the proper operation of non-chemical water treatment systems which serve the boiler plant including: Feedwater DE aerator, water softener, reverse osmosis systems (if applicable), //dealkalyzer// and continuous blowdown. The goals are safety, reliability and longevity of the steam and condensate piping and equipment in the boiler plant, in the steam distribution system and in the various buildings of the VA facility. This is an abbreviated Statement of Work; the full Statement of Work shall accompany the Solicitation.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents