Similar Projects
Reported | 05/26/2022 12:00 AM |
Project Title | Dungeness River Caldero Side Channel |
Physical Address | View project details and contacts |
City, State (County) | Sequim, WA (Clallam County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $497,700 [brand] Estimate |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: Site work for a water / sewer project in Sequim, Washington. Completed plans call for site work for a water / sewer project. This Contract provides for the restoration of fish habitat in the Dungeness River near river mile (RM) 10. The Work includes but is not limited to the following. 1) Excavating a side channel. 2) Installing Engineered Logjams (ELJs) and log habitat structures within the excavated side channel (while disconnected from the main river) and within the flowing river channel. 3) Furnishing and hauling streambed boulders. 4) Hauling and staging timber. 5) Assembling and installing rock collar anchors. 6) Isolating wetted Work areas to prevent, elevated turbidity levels and fish harm. 7) Site restoration, seeding, and other Work. This Work includes connecting the side channel to the river. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |