Similar Projects
Craftsman Farms White Cottage Phase 1 Rehabilitation
Renovation
Results
Morris Plains, NJ 07950

Phase II: Exterior Restoration of the Carriage House at Acorn Hall, Morristown
Renovation, Demolition
Post-Bid
Morristown, NJ 07960

Historic Restoration General Contractor for Phase IV: Partial Exterior Restoration Of The Merchants And Drovers Tavern
Renovation, Demolition
Post-Bid
Rahway, NJ 07065

Vannatta Farmstead Summer Kitchen Interior Restoration
Renovation
Post-Bid
Phillipsburg, NJ 08865

Jesse Allen Park Phase 3
New Construction
Bidding
Newark, NJ 07108

Professional Exhibit Improvements Plan for the Manasquan Reservoir Environmental Center
Renovation
Results
$80,350 est. value
Lincroft, NJ 07738

Princeton University Art Museum
New Construction - 144,000 SF
Design
$10,000,000 CJ est. value
Princeton, NJ 08544

Rehabilitation and Addition to the Carriage House
Renovation
Results
$1,430,900 est. value
Caldwell, NJ 07006

Phase IC Exterior Restoration of the Seward House
Renovation
Post-Bid
Mount Olive, NJ 07828

Seeking Restoration General Contractors for Exterior Restoration of the Tenant House Ayres/Knuth Farm
Renovation
Post-Bid
$289,024 est. value
Denville, NJ 07834

Carriage House Restoration and Rehabilitation
Renovation
Results
Paterson, NJ 07503

Historic Restoration General Contractors for Partial Interior Restoration/MEP Upgrades at the Ford-Faesch House
Renovation
Post-Bid
Wharton, NJ 07885

Restoration of the Ford-Faesch House - Phase V
Renovation
Post-Bid
Wharton, NJ 07885

Last Updated 06/29/2021 03:27 PM
Project Title

Smith-Baldwin House Phase 3 Rehabilitation

Physical Address View project details and contacts
City, State (County) Parsippany, NJ 07054   (Morris County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the project includes, but is not limited to the following: 1. New HVAC system Units 2-4 Base Bid. 2. New HVAC system Unit 5 Alternate #1 3. New concrete slabs in basement 4. New footings and steel columns in basement 5. Demolish existing CMU flue 6. Patch and paint exterior millwork and roofing. 7. Cutting and patching interior finishes for installation of new HVAC system.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents