Similar Projects
Parc 20
New Construction
Conception
Arlington, TX

Self Storage
New Construction
Conception
Fate, TX

Cooper Street Warehouse & Storage
New Construction - 253,033 SF
Design
$10,000,000 CJ est. value
Arlington, TX 76001

Princeton Meadows Storage
New Construction - 63,421 SF
Design
$3,800,000 est. value
Princeton, TX 75407

Golf Cart Barn
Post-Bid
Panorama Village, TX 77304

Prism Electric Office Development - Shell Building
New Construction - 25,600 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Leander, TX 78641

Supply Support Activity (SSA) Warehouse
Results
$10,000,000 to $25,000,000 est. value
Fort Hood, TX

Modular Buildings, Classrooms, and Relocation Services
Term Contract
Results
Austin, TX 78759

Shans Carpets & Fine Flooring
New Construction - 12,500 SF
Construction
$1,200,000 est. value
Houston, TX 77034

Sesco Cement Packing Warehouse
New Construction
Construction
$1,612,500 est. value
Houston, TX 77011

Self Storage
New Construction
Conception
Royse City, TX

15th Street Mixed-Use Development
New Construction
Design
Texarkana, TX 75501

Ravago Americas
New Construction - 224,209 SF
Post-Bid
Baytown, TX 77523

Fire Department Metal Building
New Construction - 3,200 SF
Results
Conroe, TX 77303

University Drive Storage
New Construction - 547,400 SF
Construction
$4,300,000 est. value
Denton, TX 76207

Last Updated 01/06/2022 10:58 PM
Project Title

2019-2020 TxCDBG WTP Improvements

Physical Address View project details and contacts
City, State (County) San Augustine, TX   (San Augustine County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an approximate 60' wide x 10' long metal building to fully enclose an existing building at the San Augustine water treatment plant including, electrical, lighting, concrete, access ramps, filter backwash drain piping, and other necessary appurtenances.

Details

600 SF - Warehouse/Storage, 600 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents