Similar Projects
Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

Hilltop Plant Stairs Screens Replacement - City Of Kingman
Alteration
Conception
$500,000 est. value
Kingman, AZ 86401

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 1 - Arizona Department of Transportation (AZDOT)
Infrastructure
Design
$70,000,000 CJ est. value
Kingman, AZ 86401

Ramar Road Drainage Improvements - City of Bullhead City
Infrastructure
Design
$1,050,000 CJ est. value
Bullhead City, AZ 86442

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager at Risk - Construction Manager at Risk (CMAR) - AMTC - Advanced Manufacturing Training Center
New Construction, Infrastructure - 30,000 SF
Bidding
$12,500,000 CJ est. value
Kingman, AZ 86401

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

RFP D/B - Two Single-family Homes in Peach Springs
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Peach Springs, AZ 86434

Community Water and Wastewater Service for Fayeanne Crook Homesite
Infrastructure
Results
Peach Springs, AZ

Animal Shelter Trenching
Infrastructure
Results
Kingman, AZ 86409

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Trails at Black Mountain
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Bullhead City, AZ 86442

Airway Avenue Drainage Improvements - City of Kingman
Infrastructure
Conception
$2,750,000 est. value
Kingman, AZ 86409

AutoZone # 5301 / Pomona
New Construction, Infrastructure - 6,800 SF
Design
$1,500,000 CJ est. value
Bullhead City, AZ 86442

AutoZone #5704 / Lake Havasu City
New Construction, Infrastructure - 6,446 SF
Bidding
$1,500,000 CJ est. value
Lake Havasu City, AZ 86404

Last Updated 02/20/2023 01:09 PM
Project Title

Lakeside Drive Sewer Replacement - City of Bullhead City

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86442   (Mohave County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.thebee.news/city-wide-maintenance-and-capital-improvement-projects-week-of-february-20/ ___________________________- This project consists of the replacement of approximately 7,500 linear feet of existing 12" sewer with 21" sewer from Coral Isle Drive to the 10-4 Lift Station at Chaparral Drive in Rotary Park, and connects the existing force mains to this new sewer line at Coral Isle Drive. This project will help eliminate corrosion and sewer odors in this area and provide the additional needed capacity identified during preparation of the Section 208 Wastewater Master Plan in 2012. As of April 12 2019, this project is currently in the FY 2019-2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2020. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2020 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents