Similar Projects
Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Architectural and Engineering Services, SD Union Building Renovation
Results
Vermillion, SD 57069

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Architecture and Engineering Services, Wellness Center Expansion
Addition, Alteration
Results
Vermillion, SD 57069

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Architectural and Engineering Services - South Dakota Union Building
Renovation
Results
$4,000,000 est. value
Vermillion, SD 57069

Architectural and Engineering services , USD Counseling Center Renovation
Renovation, Alteration
Post-Bid
Vermillion, SD

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Architectural and Engineering Services - Parking Lots 14 and 15 Improvement
Infrastructure
Post-Bid
Vermillion, SD 57069

Architect-Engineer Services for Various Civil Works and Support for Other Agencies IDIQ
Renovation, Term Contract
Post-Bid
Less than $250,000,000 est. value

Sources Sought For A&E Services, Ellsworth Afb, South Dakota
Renovation, Alteration
Post-Bid
Less than $2,500,000 est. value

Last Updated 04/06/2023 03:57 PM
Project Title

Olson Hall Building Renovation

Physical Address View project details and contacts
City, State (County) Vermillion, SD 57069   (Clay County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 6, 2023, an architect has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Firms desiring to be considered for providing professional services for this project should send a statement of interest that outlines qualifications and experience for this project. Statements of Interest should at a minimum include the following: 1. Specialized expertise, capabilities, and technical competence as demonstrated by the team's capabilities, proposed approach and methodology to meet the project requirements. (30%) 2. Resources available to perform the work, including any specialized services, within the specified time limits for the project. Include resumes of all personnel, including sub-consultants who will be assigned to this project for the entire duration. (15%) 3. Record of past performance, including price and cost data from previous projects, quality of work, ability to meet schedules, cost control, and contract administration. (30%) 4. Availability to project locale. (5%) 5. Familiarity with project locale. (10%) 6. Proposed project management techniques. (5%) 7. Ability and project history in handling special project constraints. (5%) The State is looking for firms interested in providing professional Architectural and Engineering services for the project referenced above. The project scope will involve the design, estimate, bid and construction for Olson Hall, Building Renovation at the University of South Dakota in Vermillion, South Dakota, OSE # R0623--08X. Project scope is for the full design, construction administration, cost estimate, and the construction to renovate four (4) floors of Olson Hall. Project will include demolition, concrete, framing, doors/hardware/frames, finishes, toilet accessories, fire sprinkler, plumbing upgrades, HVAC upgrades, electrical upgrades, fire alarm upgrades, and card access. The project will need to be designed and ready for bid advertisement by February 2023. Construction is anticipated to start May 2023 and complete in July 2024 A technical review committee will select the firm based on the criteria shown. The committee respectfully requests that statements of interest be limited to 25 pages or less. This is not a requirement; merely a request. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents