Similar Projects
Kisker And Route 364 Self Storage
New Construction, Infrastructure - 124,032 SF
Conception
$14,000,000 CJ est. value
Saint Peters, MO 63376

Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

Mexico Road and Deer Grove Drive Residential
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Saint Peters, MO 63376

Busch (August A) Mem CA Lake 33 and 34 Floating Dock Replacement
Infrastructure
Bidding
$55,000 CJ est. value
Augusta, MO 63332

Grading, Pavement, and Drainage
Infrastructure
Bidding
$250,000 CJ est. value
New Melle, MO 63365

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

2021 District Concrete
Results
Dardenne Prairie, Lake Saint Louis, O'Fallon, Wentzville, MO 63385

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

Reserve at St. Peters
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Saint Peters, MO 63376

City of St. Charles Fire Station #2
New Construction, Infrastructure
Bidding
$4,200,000 CJ est. value
Saint Charles, MO 63303

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

Last Updated 09/29/2022 09:03 AM
Project Title

RFQ Engineering - Main Street - Phase III

Physical Address View project details and contacts
City, State (County) Cottleville, MO 63366   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Aid No: STP-7302(690) Location: Main St. between railroad tracks and St. Joseph Ave Proposed Improvement: Roadway widening and resurfacing, sidewalk/pedestrian improvements to meet ADA compliance. Length: (0.4 mi) Approximate Construction Cost: $2,400,000 DBE Goal Determination: 14% The method of contractor selection has not been determined at this time MODOT - RFQ Engineering - Main Street - Phase III

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents