Similar Projects
1121 Electric Avenue Warehouse and Office
New Construction, Infrastructure - 17,774 SF
Design
$3,000,000 CJ est. value
Wayland, MI 49348

Hidden Forest Drain Project
Infrastructure
Bidding
$100,000 CJ est. value
Allegan, MI 49010

Hidden Forest Drain Project
Infrastructure
Bidding
$100,000 CJ est. value
Allegan, MI 49010

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

66th Street Water Special Assessment District No. 1
Alteration
Post-Bid
Saugatuck, MI

Bridge Street Improvements
Alteration
Results
$206,330 est. value
Saugatuck, MI 49453

2022 Shared Use Path Repairs
Infrastructure
Results
$437,925 CJ est. value
Park Township, MI 49424

Harvest Meadows Phase II Condominiums
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Leighton Township, MI 49348

Fastool Building Addition
Addition, Demolition, Infrastructure - 7,100 SF
Pending Verification
$1,000,000 CJ est. value
Wayland, MI 49348

Hot Mix Asphalt Resurfacing, Full Depth Concrete Pavement Repairs, Joint Resealing and Underdrain Outlet Cleanout on I-196
Infrastructure
Bidding
$2,851,000 CJ est. value
Fennville, MI 49408

Water Distribution System Materials Inventory
Infrastructure
Post-Bid
Plainwell, MI

Middle School Pool and Gym Addition Project - Packages 1 & 2
Addition, Demolition, Infrastructure
Results
$6,174,591 CJ est. value
Plainwell, MI 49080

Bentheim Elementary - 2023 Bond - Hamilton Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Hamilton, MI 49419

Watermain Loop Improvements
Infrastructure
Post-Bid
$2,000,000 est. value
Otsego, MI

Allegan Area Educational Service Agency - Hillside Behavioral & Learning Center
Renovation, Infrastructure - 3,112 SF
Results
$1,704,504 CJ est. value
Allegan, MI 49010

Last Updated 07/24/2023 06:04 PM
Project Title

Hazelwood Drive Water Main Improvements

Physical Address View project details and contacts
City, State (County) Otsego Township, MI 49080   (Allegan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: 2,250 FT of Ductile Iron Water Main Including all necessary appurtenances and restoration The work to be performed under this contract will be financed and paid for by funds received from a C2R2 Grant from the Michigan Department of Environment, Great Lakes, and Energy (EGLE) A bid bond, certified check, or cashiers check payable to Otsego Township in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of Sixty (60) days after the receipt of bids. The project shall be completed within 75 days of mobilization to the site, but no later than August 2, 2024.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents