Similar Projects
Canal and Ditch Cleaning and Grinding
Infrastructure
Bidding
FL

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

Emergency Debris Removal/Dike Repair
Results
Fort Pierce, FL 34982

Metal Culverts
Infrastructure
Post-Bid
Port Saint Lucie, FL

Shore Protection Project, Beach Rennourishment 2021, Ft Pierce, St, Lucie County, Florida
Results
$5,000,000 to $10,000,000 est. value
Fort Pierce, FL GROUP118

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Immokolee Road at FPFWCD Canal 5 Culvert Replacement
Results
$1,000,000 est. value
Fort Pierce, FL 34982

Construction of the Sagamore Storm Water Treatment Areas - East and West
Results
Less than $1,890,000 est. value
Port Saint Lucie, FL 34983

Drainage Repair
Results
Less than $800,000 est. value

St. Lucie County Fire District Stations 10 & 15 Concrete & Drainage Rehabilitation
Results
$178,475 est. value
Fort Pierce, FL 34953

Drainage
Results
Less than $400,000 est. value

Midway Road at NSLRWCD Canal 22
Results
Fort Pierce, FL 34950

Rehabilitation/Repair of Water Control Structures A-22, A-24 and one (1) BSL-2, Twin Culverts at the A-2 Pond
Infrastructure
Results
$1,600,000 est. value
Port Saint Lucie, FL

Last Updated 01/10/2022 02:14 AM
Project Title

Swale Line Maintenance - Area B

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The selected Bidder shall perform swale liner maintenance, including, but not limited to weed removal and edging using equipment, debris removal, and repair or replacement of loose or damaged liner, in accordance with the Monthly Schedule issued by the Project Manager, or their designee. 2. The Contractor shall perform work in accordance with the Monthly Schedule issued by the Project Manager, or his/her designee. 3. The Contractor shall deliver daily VIA email, facsimile, or in person, a detailed work schedule to identify the specific work in progress to the Project Manager or their designee. 4. Hours of Service - Work shall be performed by the Contractor between (seven) 7:00am and dusk, Monday thru Friday. Work shall not be performed on Saturday or Sundays unless specifically authorized in writing by the Project Manager. The Contractor will not be allowed to work during any City recognized holiday without prior written notice. 5. Maintenance of Swale Liners - 5.1 If the liner is under water, the City suggest that the Contractor start at the outfall and work their way back to the beginning of the block, this will alleviate any blockage in the liner, however, the Contractor is responsible for the methods and means to perform this scope of work. 5.2 Contractor shall edge the liner during each rotation. 5.3 Contractor shall weed eat along the liner if necessary. 5.4 Contractor shall shovel out and remove any and all debris i.e. sand, grass clippings, and debris from all the liner. At the end of each daily work shift, all accumulated material must be dumped at the City designated site unless prior approval by the Project Manager or their designee to temporarily leave along the City right of way is authorized. If the City allows overnight storage of material, they are to be secured with DOT reflective cones. The site must be restored to equal or better condition, which may require replacement sod within twenty-four (24) hours. This decision will be at the Project Manager or their designee’s discretion. 5.5 The City will provide the site where debris shall be hauled to. The Contractor will be required to provide cubic yard reports of debris removed at the beginning of the following work week. 5.6 Contractor shall be required to shovel dirt and debris out of all culverts and outfall pipes up to three (3) feet. Contractor shall also be required to shovel clean and edge concrete pads at culvert ends.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents