Similar Projects
Bridge and Highway Maintenance Materials
Term Contract
Bidding

Bituminous Materials, Plant Mix
Post-Bid

Consortium Stone Bid
Post-Bid
Chalfont, PA 18914

Consortium Stone
Post-Bid
Chalfont, PA

Limestone
Post-Bid
Morrisville, PA

Salt and De-Icing Materials
Term Contract
Post-Bid
Newtown, PA

Road Material
Term Contract
Post-Bid
Quakertown, PA 18951

Salt and De-Icing Materials
Term Contract
Post-Bid
Newtown, PA 18940

Limestone
Post-Bid
Morrisville, PA 16858

Road Material Aggregates
Post-Bid
Quakertown, PA 18951

Warm Mix Asphalt
Post-Bid
Quakertown, PA 18951

Road Materials
Post-Bid
Quakertown, PA

Aggregate and Anti-Skid
Term Contract
Bidding

Gallons of Ultra Low Sulfur Diesel
Post-Bid
Southampton, PA 18966

Asphalt Materials
Bidding

Reported 03/13/2020 12:00 AM
Project Title

Stone

Physical Address View project details and contacts
City, State (County) Telford, PA 18924   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/19/20
Owner View project details and contacts
Architect View project details and contacts
Description

a) Stone 1) No. 1 Screening – approximately 100 tons 2) No. 1-B Aggregate – approximately 500 tons 3) No. 2-A Aggregate – approximately 1,000 tons 4) No. 2-B A LEGAppL NOTICEyS 4) No. 2-B Aggregate – approximately 500 tons 5) No. 3-A Aggregate – approximately 200 tons 6) No. 4 Aggregate – approximately 300 tons b) Paving Equipment Rental 1) 240 Barber Greene Paver with 10-20 foot screed, without extensions including operator and screed man – approximately 50 hours 2) 225 Barber Greene Paver with 8-16 foot screed, including operator and screed man – approximately 8 hours 3) DD-90 Ingersoll Rand vibratory roller-66” roll width, 10-18 ton with operator – approximately 60 hours 4) Dresser Tandem Static Roller, 3.5 ton with operator– approximately 16 hours 5) 400 Horsepower Milling Machine w/sonic grade controls and cutting width of 79 inches, capable of 87 inches with operatorsapproximately 40 hours 6) 300 Hp Milling Machine with sonic grade controls and cutting width of 52”- approximately 8 hours 7) Tri-Axle Dump Truck – 100 hours c) Road Oil and Related Equipment Rental 1) E-3M Asphalt – approximately 25,000 gallons 2) Computer Regulated selfpropelled 8’-20’ hydraulically expandable Chip Spreader with full crew – approximately 24 hours 3) 8-12 Ton 9-Wheel Pneumatic Roller – approximately 24 hours 4) One way move of chipper

Details

Division 32 - Exterior Improvements, Aggregate Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents