Similar Projects
Landscape Maintenance
Bidding
$350,000 est. value

Landscape Maintenance
Bidding
$250,000 est. value

Natural and Synthetic Surfaces for Sport Fields, Tracks, Courts, Playground and Landscaping Applications
Post-Bid
Chipley, FL 32428

Highway 98 Median and Right of Way Landscaping - 2020
Term Contract
Post-Bid
De Funiak Springs, FL 32433

Roadside Maintenance
Results
Chipley, FL 32428

Grassing, Seeding and Sodding
Results
Less than $75,114 est. value
FL

Herbicide Application
Bidding
$500,000 est. value

Landscaping
Results
Less than $495,258 est. value
FL

Mowing
Results
Less than $315,792 est. value
FL

Landscape
Results
Less than $250,000 est. value

Tree Cutting/Trimming
Results
Less than $200,000 est. value

Mowing
Results
Less than $19,818 est. value
FL

Tree Cutting
Results
Less than $250,000 est. value

Landscape
Results
Less than $916,892 est. value
FL

Fertilizer
Results
Less than $160,000 est. value

Reported 10/09/2020 12:00 AM
Project Title

Mowing

Physical Address View project details and contacts
City, State (County) (Holmes, Walton, Washington Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $220,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work Document-driven Contract consists of routine mowing of grassed and vegetated roadside areas along Interstate 10 (State Road 8), also includes mowing a ten foot strip along Interstate fence and Tier 2 mowing up to twice a year in Holmes, Walton, and a portion of Washington Counties as shown in the Appendices. Hand labor may be required to perform the specified work in certain areas. Hand labor shall be considered incidental to the type of mowing being performed. Section 0001 Large Machine Mowing (Ac) e104- 4- 1 Mowing (Regular/Large Machine) Ac 7,375.230 e104- 4- 2 Mowing (Slope) Ac 421.740 e104- 4- 4 Mowing (Intermediate Machine) Ac 236.210

Details

Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents