Similar Projects
Streambank Repairs
Bidding
Raleigh, NC 27604

Raleigh Green Stormwater Infrastructure Retrofits
Bidding
Less than $600,000 est. value
Raleigh, NC 27602

Ramblewood Drainage Improvements Project
Post-Bid
Raleigh, NC

Dorothea Drive Drainage Improvements (Formal)
Post-Bid
Raleigh, NC

Large Diameter Pipe, Fittings and Valves
Results
Raleigh, NC

Pond Maintenance Services NC Museum of Art
Results
Raleigh, NC

Kelly Point Ct Drainage Improvements
Bidding
Less than $100,000 est. value
Apex, NC 27502

South Mayo River Flood Reduction Project Rehabilitation
Post-Bid
$500,000 to $1,000,000 est. value

High Density Polyethylene (HDPE) Pipe and Accessories
Results
Raleigh, NC

North Ridge Drainage System Improvements and Stream Stabilization Project Phase IV and V
Post-Bid
Raleigh, NC

Slope Repair and Rock Plating on NC-540 in Wake County
Term Contract
Results
NC

Stormwater Drainage Assistance Program - Bundle Project #1
Post-Bid
Raleigh, NC 27604

Ailey Young Dam and Stream Restoration
Results
Less than $475,275 est. value
Wake Forest, NC

Stormwater Drainage Assistance Program
Post-Bid
Raleigh, NC 27610

Grading and Drainage
Results
NC

Last Updated 02/18/2019 10:47 AM
Project Title

Pullen Park Culvert (PC1) Wing Wall Repair

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of removal of existing concrete wing wall, riprap and bushes/trees and providing a soldier pile wall, grading, and providing Class 1 riprap with filter fabric. The improvements include dewatering, removal of a portion of the existing wing wall, installation soldier pile wall, protection of existing utilities and railroad tracks and removal and replacement of any signs. The contractor will be responsible for providing necessary erosion and sediment control and revegetation of disturbed area.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents