Similar Projects
Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

Z Tejas Restaurant / Kyle
New Construction, Infrastructure - 4,500 SF
Design
$500,000 CJ est. value
Kyle, TX 78640

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

150 Business Park Public/Private Wastewater Line
Results
Kyle, TX 78640

Piland Triangle Interconnect
Infrastructure
Results
$1,782,770 est. value
Austin, TX

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Bobcat Buda
New Construction, Infrastructure - 11,324 SF
Pending Verification
$1,300,000 CJ est. value
Buda, TX 78610

Garison Park Development - P03 - City of Buda
Infrastructure
Pending Verification
$12,600,000 CJ est. value
Buda, TX 78610

Gary Job Corp Lift Station (LS #46) Decommissioning and Water Main Extension - 575 - City of San Marcos
Renovation, Infrastructure
Conception
$7,800,000 CJ est. value
San Marcos, TX 78666

Bobcat Beverage Mart - San Marcos
New Construction, Infrastructure - 1,937 SF
Design
$350,000 CJ est. value
San Marcos, TX 78666

Kissing Tree West Centerpoint Road - Phase 2B
Infrastructure
Post-Bid
San Marcos, TX 78666

Last Updated 10/03/2022 12:07 PM
Project Title

Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $8,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of constructing a new 12-inch, 24-inch, 27-inch wastewater mains from State Highway 21 & Harris Hill Rd. along Hemphill Creek to the proposed Highway 80 Lift Station (WWMP #11). This project also consists of tying in the existing 8-inch force main from the Gary Job Corp Lift Station and 6-inch force main from the Blanco River Village Lift Station into the proposed 24-inch wastewater main near the intersection of State Highway 21 and Old Bastrop Highway. WWMP#12 The project is included in the city's 2023-2032 capital improvement plan (CIP). As of October 3, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents