Similar Projects
Watermain Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Hillside, IL 60162

Plumbing Supplyhouse
Term Contract
Post-Bid
Less than $25,000 est. value
River Forest, IL 60305

2022 Backflow Testing and Repairs
Alteration
Post-Bid
Elgin, IL

Piping Insulation and Lighting Replacement at Tefft Middle School
Alteration
Results
Streamwood, IL 60107

South Fire Station Bunk Room, Locker Room and Restroom
Renovation
Results
Oak Park, IL 60304

On-Call / Emergency Services - Plumbing
Alteration
Post-Bid
Cicero, IL

Renovate Residences Plumbing - Remod & Rehab
Alteration
Results
Less than $250,000 est. value
Park Forest, IL 60466

Residential Plumbing
Alteration
Post-Bid
$10,000 est. value
Barrington, IL

Public Works Center Plumbing Repairs
Alteration
Results
Oak Park, IL

Industrial Arts Renovation - Bid Package 22A- Plumbing Bid Package 23A- HVAC Bid Package 26A- Electrical
Alteration
Post-Bid
$600,000 est. value
Burbank, IL 60459

Construction Services for Millennium Station Boiler Replacement
Renovation
Results
$698,000 CJ est. value
Chicago, IL 60601

Furnish and Deliver Plumbing Pipe, Fittings and Valves to Various Locations for a One-year Period
Term Contract
Post-Bid
$466,500 est. value
Chicago, IL

Lilac Avenue and Maclean Court Roadway and Utility Improvement
Infrastructure
Results
$1,969,485 CJ est. value
Glenview, IL 60026

Replace Piping and Storm Sewer Pumps
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Chicago, IL 60640

New Field Domestic Water Pump
Renovation
Results
$57,750 CJ est. value
Chicago, IL 60626

Last Updated 08/15/2023 04:32 AM
Project Title

Maria Diaz Martinez - Plumbing Riser Replacement Project

Physical Address View project details and contacts
City, State (County) Chicago, IL 60614   (Cook County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,989,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for Maria Diaz Martinez - Plumbing Riser Replacement Project includes replace existing plumbing risers from the ground floor to the fifth floor. This project includes but is not limited to providing, installing and connecting the new plumbing risers, removal and disposal of any hazardous materials encountered as described in the technical specifications and drawings. All units will need to be accessed throughout the course of this project so work shall be performed in a fashion that has the least impact to residents. The Scope of Work is further described in the detailed Technical Specification and Drawings. Questions may be submitted through CHA's Supplier Portal or in writing to the Procurement Specialist as shown below by no later than 11:00 AM (Central) on Wednesday, May 3, 2023. The date set forth in the Notice to Proceed will be on or around July 30, 2023; The Substantial Completion Date of July 30, 2024 for ALL WORK is as shown above

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents