Similar Projects
Glacier Dental
New Construction, Infrastructure - 16,786 SF
Conception
$9,800,000 CJ est. value
Oshkosh, WI 54904

Glacier Dental
New Construction, Infrastructure - 16,786 SF
Conception
$9,800,000 CJ est. value
Oshkosh, WI 54904

Police Department Building Addition - City of Neenah
Addition, Demolition, Infrastructure
Design
$5,500,000 CJ est. value
Neenah, WI 54956

Chestnut Street Water Utility - Division to Oak - City of Neenah
Infrastructure
Design
$710,000 CJ est. value
Neenah, WI 54956

West Lincoln Avenue and McKinley Street Reconstruction
Infrastructure
Bidding
$2,000,000 CJ est. value
Oshkosh, WI 54901

Creekside Estates Roadway Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Menasha, WI 54952

Darboy Community Park 2022 Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Menasha, WI 54952

South Park Avenue Sanitary Lift Station 3 Generator Structure
Infrastructure, Alteration
Post-Bid
$500,000 est. value
Neenah, WI 54956

Sunnyview Expo Center Phase 1 Site Development
Infrastructure
Results
Oshkosh, WI 54901

American Drive Pond
Infrastructure
Results
$1,646,627 CJ est. value
Menasha, WI 54956

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Construct Fisheries Equipment Storage Facility
New Construction, Infrastructure
Construction
$587,570 CJ est. value
Oshkosh, WI 54901

Oshkosh Avenue Commercial Development
New Construction, Infrastructure - 7,896 SF
Pending Verification
$2,000,000 CJ est. value
Oshkosh, WI 54902

Perimeter Road and Fence Repair Wisconsin Resource Center
Infrastructure
Pending Verification
$1,600,000 CJ est. value
Oshkosh, WI 54901

Jefferson Park Softball/Launch Restroom - PR-2024-002 3 - City of Menasha
Renovation, Infrastructure
Conception
$200,000 CJ est. value
Menasha, WI 54952

Last Updated 02/14/2023 03:11 PM
Project Title

Gold Cross / Menasha

Physical Address View project details and contacts
City, State (County) Menasha, WI 54952   (Winnebago County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

New Building 15,996 sq.ft. - Office-Vehicle Storage-Vehicle Wash PROPOSED PROJECT START DATE: April 4, 2023 PROPOSED PROJECT COMPLETION DATE: October 2023

Details

1 Story Above Grade, 15,996 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents