Similar Projects
Bituminous Concrete Resurfacing
Bidding
Less than $1,500,000 est. value
Goldsboro, NC

2019-2020 Street Resurfacing Project
Post-Bid
Smithfield, NC 27577

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Stoney Creek Park Greenway Construction
Results
Less than $40,283 est. value
Goldsboro, NC

2021 Street Resurfacing Project
Post-Bid
Garner, NC

Jones Sausage Road Widening Project Axis
Results
Less than $4,190,867 est. value
Garner, NC 27529

FY 2021 Road Rehabilitation Project
Post-Bid
Clayton, NC

Johnston County Landfill Phase 4A Access Road
Results
Less than $128,564 est. value
Smithfield, NC 27577

Johnston County Milling and Resurfacing
Results
NC

Thin Lift Overlay Pavement Preservation
Results

2020 Street Resurfacing Project
Results
Less than $824,262 est. value
Garner, NC

FY 20 Road Rehabilitation Project
Results
Clayton, NC

2020 Street Paving Improvements Project
Results
Less than $700,000 est. value
Goldsboro, NC

Grading, Drainage and Paving
Results
NC

Last Updated 11/18/2020 04:18 AM
Project Title

Milling, Resurfacing and Shoulder Grading

Physical Address View project details and contacts
City, State (County) (Johnston, Wayne Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Items Lump Sum Ls Mobilization 200 Cy Borrow Excavation 425 Ton Incidental Stone Base 14.4 Smi Shoulder Reconstruction 230,000 Sy Milling Asphalt Pavement, ***" Depth (1-1/2") 12,113 Sy Milling Asphalt Pavement, ***" Depth (2") 3,000 Sy Milling Asphalt Pavement, ***" Depth (2-1/2") 11,450 Sy Incidental Milling 2,660 Ton Asphalt Conc Base Course, Type b25.0c 2,647 Ton Asphalt Conc Intermediate Course, Type i19.0c 34,794 Ton Asphalt Conc Surface Course, Type s9.5b 40,106 Ton Asphalt Conc Surface Course, Type s9.5c 4,986 Ton Asphalt Binder For Plant Mix 1,295 Ton Patching Existing Pavement 1 Ea Adjustment Of Drop Inlets 2 Ea Adjustment Of Manholes 11 Ea Adjustment Of Meter Boxes Or Valve Boxes 7,571 Sf Work Zone Advance/General Warning Signing 8 Ea Portable Changeable Message Sign Lump Sum Ls Temporary Traffic Control 515,728 Lf Thermoplastic Pavement Marking Lines (4", 90 Mils) 68,200 Lf Thermoplastic Pavement Marking Lines (6", 90 Mils) 1,680 Lf Thermoplastic Pavement Marking Lines (8", 90 Mils) 13 Ea Thermoplastic Pavement Marking Character (90 Mils) 68 Ea Thermoplastic Pavement Marking Symbol (90 Mils) 2,880 Lf Cold Applied Plastic Pavement Marking Lines, Type ** (4") (Ii) 2,880 Lf Removal Of Pavement Marking Lines (4") 548,714 Lf Generic Pavement Marking Item Hot Spray Thermoplastic Pavement Marking Lines, (4", 50 Mils) 80 Lf Generic Pavement Marking Item Hot Spray Thermoplastic Pavement Marking Lines, (8", 50 Mils) 80 Lf Generic Pavement Marking Item Thermoplastic Pavement Marking Lines (16", 90mils) 340 Lf Generic Pavement Marking Item Thermoplastic Pavement Marking Lines (24", 90mils) 265 Ea Generic Pavement Marking Item Non-Cast Iron Snowplowable Pavement Markers 1,010 Ea Permanent Raised Pavement Markers 900 Lf Temporary Silt Fence 300 Lf Wattle 9 Acr Seeding & Mulching 1,800 Lf Inductive Loop Sawcut

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents