Similar Projects
PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Bidding
Lexington, KY 40506

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Bidding
Lexington, KY 40506

Roofing Envelope Services
Post-Bid

HVAC and Plumbing Services for City of Urbana Facilities
Term Contract
Post-Bid
Urbana, IL 61801

Multiple Roof Replacement
Renovation
Results
Rantoul, IL 61866

Replace Roofing Systems Statewide, Phase I
Results
Less than $2,000,000 est. value

Best Electrical
Infrastructure
Pending Verification
$250,000 est. value
Rantoul, IL 61866

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Emergency Generators Rebid
Renovation
Results
Less than $2,000,000 est. value
Rantoul, IL 61866

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Accessibility & Elevator Upgrades - Bid Package No. 1 (Electrical)
Renovation
Results
Urbana, IL 61801

Roofing Repair and Maintenance
Post-Bid

Middle Fork River Forest Preserve Activity Center HVAC Replacement
Results
Less than $65,000 est. value
Penfield, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

FY21 UCSD Roof Repairs - Station A at Northeast Treatment Plant (NEP)
Results
Urbana, IL 61802

Reported 08/13/2021 12:00 AM
Project Title

North Campus Chiller Plant - Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

This project will install two to three cooling tower cells, matching the existing CT-06 and CT-07 installed in the Phase 1 project, on the south perimeter of the North Campus Chiller Plant Roof. The project will include the new tower cells, the structure to support them and any and all systems and components to integrate the cooling towers into the existing plant condenser water system. The project will consider the findings and recommendations of a previous study completed in 2013 for the full buildout of cooling tower capacity for the plant. Additionally, it is the intent of the project to replace approximately 4,500 sq. ft. of the existing roof membrane in the south area of the existing roof.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents