Similar Projects
RFP Engineering - Civil Engineering Services - Rezoning and Renovation of the Downtown Campus
Renovation
Conception
$250,000 CJ est. value
Fort Myers, FL 33901

RFP Design - Architectural Design Services- Renovation of the Downtown Campus
Renovation
Conception
$200,000 CJ est. value
Fort Myers, FL 33901

RFP Engineering - Oasis Sport Fields
Infrastructure
Bidding
$1,000,000 CJ est. value
Cape Coral, FL 33914

RFP Design - Design, Engineering, and Architectural Services for New Emergency Medical Services Stations
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Fort Myers, FL 33901

Gec for Traffic Operations and ITS
Infrastructure
Post-Bid
$28,000,000 est. value

Professional Engineering Services for Preparation of Design-Bid-Build Documents and Design-Build Request for Proposals for Various Projects Types at DOD and Non-DOD Activities
New Construction, Renovation, Term Contract
Post-Bid
Less than $30,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

2023 Master Plan Update
Infrastructure
Post-Bid
Fort Myers, FL

Southern Region Facilities Architect-Engineer Multiple Award Contracts
Results
$2,500 to $6,000,000 est. value

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Last Updated 04/17/2023 04:22 PM
Project Title

RFP Design - Professional Design Services for the North Utilities Complex - UCD Admin Facilities

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33904   (Lee County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $11,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 17, 2023, this solicitation has been cancelled and all proposals were rejected. *The closed solicitation has been included below for reference: NO QUESTIONS WILL BE ACCEPTED AFTER: 4:00 pm, (ET) on September 20, 2022, all questions must be submitted in writing to jmyers@capecoral.gov and received by stated time. The City of Cape Coral is initiating the Request for Proposals (RFP) process to solicit proposals from qualified respondents to provide uniform guidelines and submission requirements in the acquisition of professional services for the design of the North Utilities Complex - UCD Admin/Warehouse Facilities. It is the intent of the City to select and contract with one design firm. This solicitation is to comply with the Florida Statute 287.055 Consultant's Competitive Negotiation Act (CCNA). The City of Cape Coral is planning the development of the Utilities Collection and Distribution (UCD) - Administrative Office and Warehouse Facilities at the North Utilities Complex located at 1220 Kismet Parkway West. The new UCD Admin Facilities are required for the purpose of providing expected levels of service to residents of the City as water, irrigation and sanitary sewer utilities are extended to areas of the City north of Pine Island Road through the Utilities Extension Project (UEP). Improvements for the UCD Admin Building and Warehouse Facility at the North Utilities Complex include but are not limited to the following: 1. UCD Admin Building - 20,000 SF (Two Stories) - Designed for hardening and resiliency up to Category 5 Hurricane - Includes reception/receiving area, customer service area, offices, copy/media room, break room, locker rooms, showers, metal shop area, meter repair shop, exercise area, UCD Server/Communications room, IT server room, maps and file storage, conference/training room, kitchen, backup generator, provision for alternate EOC facilities, and ancillary facilities. o Bulk storage for construction materials (road base, fill, pipe bedding materials, etc.) - 8 bays min. o Parking area for UCD customers, UCD employees, and UCD City vehicles. o Parking/Storage areas for UCD Equipment ("bread trucks" with trailers) - 30 spaces min. o Vehicle wash area. o Outside storage areas. o Dumpster areas. o Site access roads. 2. UCD Warehouse - (1 Story) - Initial 20,000 SF expandable to 60,000 SF - Designed for hardening and resiliency up to Category 5 Hurricane - Includes office area, shelving for small item storage, floorspace for large item storage, covered entry for pickup/delivery, office, and bathroom. o Outside covered storage area. o Outside pipe storage area. o Outside large item storage. o Security fencing with gates. The Method of Contractor Selection has not been determined at this Time. 3. UCD/Public water fill station. 4. Space set aside for future cell tower. 5. Access roadway improvements. 6. Surface water management areas. 7. Potable water and fire protection system. 8. Sanitary sewer gravity collection system, lift station and force main. 9. Provision of electrical service for buildings/facilities. 10. Fiber Optic communications system.

Details

,, 80,000 SF - 2 Stories Above Grade, 20,000 SF. 1 Story Above Grade, 60,000 SF.
Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents