Similar Projects
Last Updated | 04/09/2021 04:01 PM |
Project Title | J059--AAVA Generator Testing & PM |
Physical Address | View project details and contacts |
City, State (County) | Ann Arbor, MI 48109 (Washtenaw County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall furnish all necessary labor, supervision, management, management support, transportation, supplies, equipment and materials necessary to furnish the following services. The services required are provided below and subject to changes should a solicitation be issued as a result of this notice. Annual load bank testing, including preventive maintenance (PM) at no additional cost, of nine (9) Generators. PM shall include Load Testing for all models except Model #3512C*, which is too large for load testing. PM procedures shall be in accordance with the published PM manuals for the equipment: 315KW Caterpillar 3406 Industrial Engine S/N 90U440-UP 500KW Detroit Diesel Series 92 S/N 360164, Model# 500DS60 900KW Detroit Diesel Series 149 S/N 358177, Model# 900DS60 750KW Caterpillar #1 S/N 9EN00523, Model# 3508 750KW Caterpillar #2 S/N 9EN00524, Model# 3508 750KW Caterpillar #3 S/N 9EN00526, Model# 3508 750KW Caterpillar #4 S/N 9EN00525, Model# 3508 750KW Caterpillar #5 S/N 9EN00528, Model# 3508 1500KW Caterpillar #6 S/N G6T00105, Model# 3512C* All work shall comply with Original Equipment Manufacturer (OEM) Specifications. The contractor shall furnish a temporary generator as needed on a separate rental agreement and the temporary generator shall be furnished within a reasonable amount of time depending on the availability of units. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |