Similar Projects
Signaw River Dredging
Infrastructure
Design
$500,000 CJ est. value
Morton, IL 61733

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Architectural Barriers Removal-Sidewalks
Infrastructure
Post-Bid
Armington, Creve Coeur, Delavan, East Peoria, Mackinaw, Minier, South Pekin, Washington, IL

Fire Station 1 Parking Lot Rework
Infrastructure
Results
Pekin, IL 61554

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Results
Delavan, IL

Illinois Central College Campus Pavement
Infrastructure
Post-Bid
$185,000 est. value
East Peoria, IL 61635

Crack and Joint Sealing on US 24/IL 9 From N of Pfeiffer Rd in Bartonville to 0.16 Mi SW of IL 9 (e.) and on IL 29 From Margaret Drive in Creve Coeur to N of Lasalle Blvd
Infrastructure
Results

Hot-Mix Asphalt Resurfacing of Harding Road in Morton Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Bridge Washing of Nine (9) Bridges Over the Illinois River
Infrastructure
Results

Hot-Mix Asphalt Resurfacing of Broadway Road in Tremont Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Street Reconstruction of Hilldale Avenue and Avon Ct
Infrastructure
Results
$1,818,517 est. value
Washington, IL

Hot-Mix Asphalt Resurfacing of Various Roads in Morton Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL

McKenzie Building ADA Parking
Infrastructure
Results
Pekin, IL 61554

Last Updated 07/13/2023 10:23 AM
Project Title

Road Work (Main Street)

Physical Address View project details and contacts
City, State (County) Hopedale, IL 61747   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 13, 2023, project was awarded to R. A. Cullinan. but awarded amount is not available.** 1. Main Street from the north side 3rd Street intersection to the south at County marker. Mill and removal of 1 1/2 " of material over approximately 7100 square yards, and apply 1 1/2 " of hot mix asphalt material over 7100 sq yds butt joint transitions where appropriate. 2. Alleyway, Bank Parking lot to Monroe Street, Mill and 1 1/2 " hot mix asphalt overlay, approx. 285 square yards, butt joint transitions where appropriate. 3. For Consideration: Town Building Drive, Mill and 1 1/2 " hot mix asphalt overlay, approximately 1108 square yards, butt joint transitions where appropriate For more information contact Rebecca Lippmann, Village Clerk at 309-449-3353.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents