Similar Projects
Replacement of AHU 9 - Halifax Health 4th Floor CVOR
Bidding
Daytona Beach, FL 32116

Halifax Health T-Zone Air Handling Unit Replacement
Post-Bid
Daytona Beach, FL 32100

Seabreeze High School HVAC, Ceiling and Lighting Building 1
Post-Bid
Daytona Beach, FL 32118

FDOT HVAC Install: Sneads WB Weigh Station
Results

Lakeside HVAC and Ceiling Replacement
Results
Less than $400,000 est. value
Port Orange, FL 32129

HVAC and Mechanical Products
Term Contract
Post-Bid

Direct Replacement of 60 Ton Chiller and Two 30 Ton Air Handlers
Results
Daytona Beach Shores, FL 32116

Seabreeze High School HVAC Renovation Building 2
Post-Bid
Daytona Beach, FL 32118

Emergency Vehicle Exhaust Extraction System
Term Contract
Results
Less than $80,000 est. value
De Land, Lake Helen, New Smyrna Beach, FL 32169

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Peabody Lobby HVAC Replacement
Results
Less than $45,000 est. value
Daytona Beach, FL 32114

Pine Ridge High School HVAC Renovation
Post-Bid
Daytona Beach, Deltona, FL 32116

Upgrade CEP Controls and AHU Dampers - New Smyrna Beach High
Results
Less than $520,000 est. value
New Smyrna Beach, FL 32168

HVAC Condensing Unit Replacement
Results
Less than $450,000 est. value
Daytona Beach, FL 32114

Indian River Elementary School - Replace Chiller Building 7
Results
Less than $150,000 est. value
Edgewater, FL 32141

Last Updated 03/12/2020 12:23 PM
Project Title

Deltona Lakes Elementary - Upgrade Chiller Plant

Physical Address View project details and contacts
City, State (County) Deltona, FL 32725   (Volusia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Building Automation System (BAS) is to provide a peer-to-peer networked, stand-alone, distributed control system for building mechanical and electrical systems. The BAS shall include an operator workstation also known as Engineering Control Center (ECC), field programmable microprocessor based control units panels, instrumentation end control devices, wiring, piping, and related systems to provide centralized and facility wide control functions. B. The BAS shall be designed such that each mechanical and electrical system will be able to operate under stand-alone control. As such, in the event of a network communication failure, or the loss of any other controller, the control system shall continue to independently operate under control. C. The System Integrator (SI) Contractor shall refer to the drawings and equipment specifications for coordination of factory installed control equipment in products furnished by others as they relate to this section. D. Provide all labor (direct employed or subcontracted), materials, programming and supervision necessary to install a complete Building Automation System (BAS) per the construction documents. Include provisions for the following: 1. Mounting hardware for all control devices. 2. Construction supervision. 3. Startup and verify proper operation of control equipment. 4. Point verification and testing of hardware and software. 5. Work in conjunction with the TAB agent to calibrate and adjust devices as required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents