Similar Projects
Villages on Mill Street
New Construction
Conception
Camden, SC 29020

Woods Crossing
New Construction - 8,400 SF
Conception
$8,000,000 est. value
Greenville, SC

LMC Mixed Use
New Construction
Design
Charleston, SC

The Settlement
New Construction
Design
Simpsonville, SC

Camden Riverfront Environmental Park
Post-Bid
Camden, SC

Playground Shade
New Construction
Post-Bid
Trenton, SC 29847

New Water Park Attractions - General Contracting
Results
Less than $1,200,000 est. value
Charleston, North Charleston, SC

New Water Park Attractions - General Contracting
Results
Less than $1,200,000 est. value
Charleston, North Charleston, SC

KinderCare
New Construction - 11,975 SF
Construction
$1,000,000 est. value
Charleston, SC

The Waterfront
New Construction
Construction
Daniel Island, SC

Playground Surfacing
Renovation
Post-Bid
Saluda, SC 29138

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Sumter Veterans Park
Post-Bid
Sumter, SC

Wannamaker County Park New Dog Park
New Construction
Results
Hanahan, North Charleston, SC 29406

TLH/WHS Ballfield Improvements Concrete Roadways, Side Irrigation and Retaining Wall
Post-Bid
Anderson, SC 29621

Reported 09/18/2019 12:00 AM
Project Title

Concrete Plaza Replacement at Isle of Palms County Park

Physical Address View project details and contacts
City, State (County) Isle of Palms, SC 29451   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of the concrete plaza at Isle of Palms County Park. The project includes the removal and construction of new concrete, benches and the addition of new ADA changing rooms as shown in the attached plan set. The existing changing rooms and drinking fountain shall be removed and protected on site for re-installation after plaza is poured and cured. An existing grill shall be removed and stored on site. All disturbed areas will be regraded and landscaped with sod and a landscape retaining wall will be constructed for planting beds on two sides of the plaza.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents