Similar Projects
HVAC, Electrical and Roofing On-Call Single Trade Services
Post-Bid
Denver, CO 80202

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Front Range Village
Renovation
Construction
Fort Collins, CO 80525

Heritage Park Restroom Renovation/Cleo Mudrock Baseball Dugout Roofing Project
Renovation
Construction
Less than $125,000 est. value
Louisville, CO 80027

City of Sterling Reroofing Project
Post-Bid
Sterling, CO 80751

Detention Center Roof G
Results
$100,000 to $150,000 est. value
Broomfield, CO 80021

Replace Roofs Main Building Southwest Campus Phases I and II Pueblo Community College
Construction
Less than $1,223,500 est. value
Mancos, CO 81328

Boulder Water Resource Recovery Facility Roofing Replacement Project
Post-Bid
Boulder, CO 80301

Safeway Roof Project
Results
Broomfield, CO 80020

Kit Carson Sand Shed Roof Repairs
Post-Bid
Kit Carson, CO 80825

Removal and Replacement Roofing
Results
Less than $60,000 est. value
Pueblo, CO 81001

Roof Replacement Johnson Building
Post-Bid
Rangely, CO

Tent Roof Maintenance and Repair
Results
Denver, CO

Last Updated 10/05/2020 03:15 PM
Project Title

Watkins - Upper Roof Replacement

Physical Address View project details and contacts
City, State (County) Watkins, CO 80137   (Adams County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $106,455
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of the existing upper roof consisting of approximately 13,260 SF. Work includes removing the existing roofing membrane to insulation, replacing any damaged insulation and and installing a new roofing assembly. Key work items are listed below; drawings and specifications describe full requirements. 1. Remove and dispose the existing gravel and top layer of existing bitumen. 2. Remove sheet metal roof flashings and counter flashings as required to install the new roofing. 3. Install new additional base layer of ISO foam insulation as part of the roof insulation system. 4. Install new HD ISO cover board. 5. Install wood nailers and modify curb height as needed. 6. Install a fully adhered EPDM roof system and EPDM uncured and cured flashings. 7. Install new sheet metal flashings, counter-flashings and coping systems. 8. Provide a manufacturer’s 20 year leak free warranty covering labor and material at a no-dollar-limit. 9. Provide a two-year MRCA Contractor’s warranty covering the roofing in a watertight condition.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents