Similar Projects
Construction of Milton Fire Station 42
New Construction, Infrastructure
Bidding
Milton, GA 30004

Contract for EP-183 Ben Hill (South) Rd. Sidewalks
Infrastructure
Bidding
East Point, GA 30364

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Stadium Red Lot Bus Only Lane
Post-Bid
Atlanta, GA 30315

T-0033-7 CDBG Roswell Road Streetscape
Results
Sandy Springs, GA

Pedestrian Improvements on Various City Roads
Results
Fairburn, GA 30213

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Town Center Xpress Park and Ride Lot Construction
Results
Atlanta, GA 30303

Construction of Washington Road Sidewalks
Results
Less than $66,182 est. value
East Point, GA 30344

Findley Plaza Revitalization Project and Inman Park Intersection Improvements
Results
Atlanta, GA 30303

Dodd Street Pedestrian Improvements Project
Results
Fairburn, GA 30213

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase B
Results
GA

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase C
Results
GA

Bohannon Road Sidewalk Project
Results
Fairburn, GA 30213

Last Updated 07/23/2021 09:24 AM
Project Title

Margaret Street Pedestrian Improvements Project

Physical Address View project details and contacts
City, State (County) Fairburn, GA 30213   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the removal of existing curb & gutter and header curb, and the installation of new header curb and sidewalk. This contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt as well as clean up and backfilling. The scope of Add Alternate #1 includes pedestrian crosswalks to the north (W. Campbellton Street) and south (Orchard Street) of Margaret Street. Add Alternate #2 includes milling, asphalt paving, the installation of traffic-print textured paving crosswalks, manhole adjustments and associated tasks.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents