Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$668,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

SR 525,Clinton Ferry Terminal Paving Preservation
Infrastructure
Bidding
$750,000 CJ est. value
Langley, WA 98260

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 to 2023 Unit Price Directional Boring Contract
Term Contract
Results
$2,000,000 est. value
Camano Island, WA

Deer Lake Access Redevelopment - Rebid
Infrastructure
Results
$91,766 CJ est. value
Clinton, WA 98236

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

Deer Lake Access Redevelopment & Lake Cavanaugh Asphalt Paving, Pile Driving & Float Installation
Infrastructure
Results
$247,955 CJ est. value
Clinton, WA 98236

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Sanitary Sewer Rehabilitation Project (Pipe-bursting)
Infrastructure
Results
$519,139 CJ est. value
Oak Harbor, WA 98277

East Cranberry Lake Dock Replacement at Deception Pass State Park
Infrastructure
Post-Bid
$850,000 CJ est. value
Oak Harbor, WA 98277

Flintstone Park Restroom Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Oak Harbor, WA 98277

Brookhaven Storm Drain Replacement
Infrastructure
Post-Bid
$700,000 CJ est. value
Langley, WA 98260

RFP D/B - East Camano Drive/ Cross Island Road Intersection Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Camano Island, WA 98282

Last Updated 02/15/2023 10:34 AM
Project Title

Upgrade and Relocate Existing Watermains

Physical Address View project details and contacts
City, State (County) Coupeville, WA 98239   (Island County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $817,702 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 15, 2023, project was awarded to C Johnson Construction, awarded amount is $817,701.63.** The project consist of the replacement of existing water mains and associated appurtenances installed within the Island county and washington state Department of Transportation right of way as follows:Engle Rd (between Fort Casey Rd and SR20) -4130 LF Water Main, SR20 ( between Engle Rd and Callens Restaurant) -1250 LF Water Main. The Town of Coupeville reserves the right to reject and or all bid and to waive any irregularities. For questions and or additional informations please contract the project Engineers, Jeff Tasoff, P.E and or arly McArdle,P.E of Davido consulting Group,Inc. by phone at 360-331-4131 or by email at jeff@dcgengr.com or carly@dcgengr.com. Work for the proposed project must completed by May1,2023.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents