Similar Projects
Springfield Township Multimodal Trail Phase 2
Infrastructure
Conception
Grove City, PA 16127

State Street Pedestrian Improvements
Infrastructure
Design
Hermitage, PA 16148

Asphalt Paving At 8 LNA Sites
Term Contract
Bidding

Clintvill Road Br Over I-79
Infrastructure
Bidding
$1,000,000 to $2,499,999 est. value
Jackson Center, PA

Completion of an Asphalt Paved Parking Lot, Concrete Curbs and Concrete Sidewalk
Post-Bid
Farrell, PA 16121

Asphalt Surface Treatment
Post-Bid
Mercer, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Paving and Sealcoating the District's Parking Lots
Results
$20,000 est. value
Mercer, PA 16137

Parking Lot Pavement Restoration Work
Infrastructure
Post-Bid
Hermitage, PA 16148

Hermitage Town Center Pedestrian Improvements
Results
Hermitage, PA 16148

Proposed Parking Lot Pavement Restoration Work
Infrastructure
Post-Bid
Hermitage, PA

CDBG Roadway Improvements
Results
Hermitage, PA 16148

Gurrera Village Concrete Sidewalk Replacement
Infrastructure
Post-Bid
Hermitage, PA 16148

2021 Street Improvement Project
Results
Sharpsville, PA 16150

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Last Updated 04/27/2022 02:07 AM
Project Title

Mercer Group 421

Physical Address View project details and contacts
City, State (County) Greenville, PA 16125   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $4,999,999
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Milling, base repair, asphalt overlay, minor drainage, guiderail, and curb/sidewalk for State Route 358 and State Route 3014 in Mercer County. Located on SR 358 from the state line in Salem Township to segment 0130 offset 3598 in Greenville Boro and on SR 3014 from the intersection with Forker Blvd in the City of Sharon to the intersection with SR18 in the City of Hermitage

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Impact Attenuating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents