Similar Projects
F-M High School Expansion
Addition
Conception
$52,000,000 est. value
Manlius, NY 13104

C-NS High School Renovations
Renovation
Conception
Cicero, NY 13039

Construction Management Services
Renovation, Infrastructure
Design
$72,184,922 CJ est. value
Syracuse, NY 13207

Annual Inspection for 2022-2023 of All School Buildings
Term Contract
Design
Syracuse, NY 13202

Oil-Water Separator Replacement at the Transportation Building
Infrastructure
Bidding
$180,000 CJ est. value
Syracuse, NY 13208

2020 Capital Project - Phase 2 - General Construction Contractor
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
DeWitt, NY 13066

2016 Capital Improvement Project - Phase 4
Renovation
Post-Bid
$150,000 to $175,000 est. value
Baldwinsville, NY 13027

RFQ - Architectural/Engineering Services
Term Contract
Post-Bid
Liverpool, NY 13088

East Syracuse Minoa CSD 2019 Capital Improvement Phase 2 - Bid Package 1
Renovation
Results
$450,000 est. value
East Syracuse, Minoa, NY 13116

Tully CSD Capital Project 2022 - Phase 2
New Construction, Renovation
Results
Tully, NY 13159

Jamesville Dewitt CSD - 2020 Capital Project
Renovation
Construction
$500,000 to $12,000,000 est. value
DeWitt, Jamesville, Syracuse, NY 13078

Skaneateles CSD Capital Project 2021 Phase 4
Renovation
Construction
$1,192,000 est. value
Skaneateles, NY 13152

C-NS High School Community Pool Facility Construction
New Construction
Conception
Cicero, NY 13039

Marcellus Central School District 2021 Capital Improvement Project Phase II
Renovation
Post-Bid
$90,000 CJ est. value
Marcellus, NY 13108

Fayetteville-Manlius CSD 2021 Capital Transfer Project
Alteration
Results
$370,000 est. value
Manlius, NY 13104

Last Updated 04/07/2023 07:05 AM
Project Title

2021 Capital Improvement Project High School - General Construction

Physical Address View project details and contacts
City, State (County) Manlius, NY 13104   (Onondaga County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $17,343,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Cash will not be accepted as a deposit. Prospective Bidders will be issued a maximum of two (2) sets each. Subcontractors, Material Suppliers, etc., will be issued a maximum of one (l) set each. All requests for delivery to locations outside of Upstate NY will incur an additional shipping charge based on the metering increase for those locations. Any sets required in excess of the above-mentioned maximums are to be obtained directly by interested parties at the full cost of printing, at their cost, directly from Plan and Print Systems. Only complete sets will be issued. At the time the order is placed, plan holder shall advise Plan and Print Systems of status as to prime bidder, subcontractor, or material supplier and to trade affiliation. Postal address, telephone number, fax number, and email will also be required. RETURN OF CONTRACT DOCUMENTS Upon returning sets promptly and in re-usable condition to Plan and Print Systems, Inc. within 30 days after the date of the Bid opening, deposits will be refunded as follows: l. Any Bidder will be refunded his or her deposit in full. 2. All other persons receiving any or all the Contract Documents, including Subcontractors and Material Suppliers, will be refunded their deposit in full. All Contract Documents received (except for Documents held by Successful Bidders) must be returned to Plan and Print Systems, Inc., at the above address. For Contract Documents which are not returned to the printer within this 30 day period, deposits will NOT be refunded. Requests for interpretation, information or clarification (RFI) of the Contract Documents must be made in writing to LeChase and King + King Architects. Responses to RFIs will not be made over the telephone. Responses to RFIs will be advisory only and will not modify the Contract Documents. The Contract Documents stand as published except as modified by written Addenda before bid and Modifications after execution of the Agreement. RFIs may be e-mailed to: Erika Civitella (King + King Architects) ecivitella@kingarch.com Donald Banks (LeChase) Donald.banks@lechase.com

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents