Similar Projects
Harvard Avenue Seawall Repair
Bidding
Less than $20,000 est. value
Marblehead, MA

Gallison Avenue Seawall Repair Project
Bidding
Less than $50,000 est. value
Marblehead, MA

Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Collins Cove Salt Marsh Enhancement Project
Post-Bid
Less than $260,000 est. value
Salem, MA

Forest River Park Seawall Repair Project
Results
Less than $3,050,000 est. value
Salem, MA

Fort Sewall Revetment
Results
Less than $95,000 est. value
Marblehead, MA

Parker Lane Seawall Repair
Bidding
Less than $20,000 est. value
Marblehead, MA

Concrete Box Culvert Sections for Valley Road
Post-Bid
Less than $60,000 est. value
Boxford, MA

Sanborn School Drainage Improvements
Results
Less than $300,000 est. value
Andover, MA 01810

Peabody Avenue Seawall Repairs
Bidding
Less than $20,000 est. value
Marblehead, MA

PMLP Drainage Swale Maintenance
Post-Bid
Less than $110,000 est. value
Peabody, MA

Culvert Replacement at Liberty Street over Upper Boston Brook Pond
Results
Less than $408,000 est. value
Middleton, MA

Scheduled A Emergency Drainage Repairs and Improvements at Various Locations
Bidding
Less than $964,171 est. value

Scheduled and Emergency Drainage Structure and Pipe Cleaning at various Locations
Results
Less than $900,000 est. value

Crescent Marsh Culvert Replacement Under Unnamed Access Road to Wheelabrator Technologies
Results
Less than $2,739,542 est. value
Saugus, MA 01906

Last Updated 01/02/2019 11:52 AM
Project Title

Masconomo Park and Morss Pier Improvements

Physical Address View project details and contacts
City, State (County) Manchester-By-The-Se, MA   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $230,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project includes the partial reconstruction of a 79-foot section of an existing granite block seawall and full replacement of a 41-foot section of an existing concrete bulkhead adjacent to a timber pier. The granite block wall repair includes removal of the top 2-3 courses and resetting them, pinned together, with clean backfill and a drainage collection system behind the wall to prevent future erosion of backfill material. Preparation for the bulkhead work includes disconnecting and partially removing the first span of the existing adjacent timber pier and relocating the adjacent timber framed pavilion. The bulkhead work will include driving steel sheet piles on the landward side of the existing concrete bulkhead, removing the existing concrete bulkhead, installation of a cast-in-place concrete sheet pile cap, and reinstallation/reconstruction of the pavilion and pier span.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents