Similar Projects
Construct Taxiway B Runway 36 to 29
Results
$3,100,000 to $4,600,000 est. value
Portland, ME 04102

Construct Runway 11 Bypass Taxiway and Perimeter Service Road Realignment
Results
Less than $1,495,000 est. value
Portland, ME

Pavement Maintenance – Runway 1R-19L at the Brunswick Executive Airport
Results
Brunswick, ME

Airport Improvements
Results
Less than $2,988,240 est. value
Frenchville, ME 04745

Reconstruct Taxilanes and Pavement Maintenance
Results
Less than $600,000 est. value
Norridgewock, ME 04957

Reconstruct, Mark, Light, and Sign Runway 6-24
Results
Less than $6,000,000 est. value
Biddeford, ME 04005

Reconstruct, Shift, Mark and Light Runway 17-35
Results
Lincoln, ME 04457

Reconstruct, Mark and Light Runway 15-33 at the Eastport Municipal Airport
Results
Eastport, ME

Airport Improvements - Hangar Taxilane Paving and Security Fence Improvements at the Presque Isle International Airport
Results
Presque Isle, ME 04769

Construct Air Cargo Taxiway and Taxiway A East - Phase 1 the Portland International Jetport
Results
Portland, ME 04102

Reconstruct and Mark Taxiway C
Post-Bid
Less than $1,750,000 est. value
Sanford, ME 04073

Construct Taxilanes at the Sugarloaf Regional Airport
Bidding
Carrabassett, ME

Last Updated 05/04/2020 11:12 AM
Project Title

Airport Improvements at Houlton International Airport

Physical Address View project details and contacts
City, State (County) Houlton, ME 04730   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,758,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct and Extend Parallel Taxiway for Runway 5-23 (Approx. 5,015’ x 35’) & Obstruction Removal for Runway 5, 23, & 19 Approaches (Approx. 25 AC)” at Houlton International Airport, Houlton, Maine. The proposed work may include but is not necessarily limited to: The reconstruction and extension of the existing parallel taxiway including reclaiming, excavation and embankment, underdrain, subbase and base gravels, paving, and new taxiway edge lights and wire, as well as vegetative obstruction removal in the runway approaches.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents