Similar Projects
Wilson Springs Sidewalks - Columbia County
Infrastructure
Conception
$406,000 CJ est. value
Fort White, FL 32038

Wilson Springs Sidewalks - Columbia County
Infrastructure
Conception
$406,000 CJ est. value
Fort White, FL 32038

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Ellisville Water Main Extension
Infrastructure
Bidding
$2,799,019 CJ est. value
Fort White, FL 32038

Ellisville Water Main Extension
Infrastructure
Bidding
$2,799,019 CJ est. value
Fort White, FL 32038

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Silicone Joint Sealer
Infrastructure
Results

District Two Bridge Tending Services
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Rountree Moore Chevrolet
New Construction, Infrastructure - 25,480 SF
Pending Verification
$5,800,000 CJ est. value
Lake City, FL 32055

TownePlace Suites by Marriott / Lake City
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Lake City, FL 32055

SR 247-Cannon Creek Retention - Columbia County
Infrastructure
Conception
$2,560,000 CJ est. value
Lake City, FL 32024

Columbia County Storm Processing and Service Center
New Construction, Infrastructure - 126,754 SF
Design
$13,000,000 CJ est. value
Lake City, FL 32025

Last Updated 01/03/2024 01:03 PM
Project Title

NW Leonia Way, NW Queen Rd, NW Chambria Way, and NW Winfield Street

Physical Address View project details and contacts
City, State (County) Lake City, FL 32025   (Columbia County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,475,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract will include the reclamation of Leonia, resurfacing of Queens and resurfacing of Winfield. Major items of work will include Maintenance of Traffic, Erosion Control, Clearing and Grubbing, Earthwork, Drainage, Reclamation, Milling, Base Construction, Asphalt Paving, Drainage Modifications, Grassing, Signs and new Pavement Markings. Deadline for questions regarding specifications and/or bid documents must be received before 5:00 P.M. on January 5, 2023. The successful bidder will be required to furnish a 5% bid bond with bid submittal, and if selected, furnish the County Manager with a performance bond and proof of liability insurance prior to commencing work.The Contractor shall provide Performance and Payment Bonds, in the form prescribed in the Exhibits to the Agreement, in the amount of 100% of the Contract Amount, the costs of which are to be paid by Contractor Liquidated damages shall be $2650.00 per day. No work is allowed on Saturdays, Sundays, and/or County designated holidays. The contract time shall be 271 days from the date of contract execution. The contractor will be required to return executed contract to the Columbia County Purchasing Director and Chad Williams, Columbia County Engineer, within 14 days of Board approval. Time can be extended by mutual agreement of both parties The Columbia County Commission reserves the right to reject any or all bids and to add to the contract or delete from the contract to stay within their funding capabilities.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents