Similar Projects
Cherry Creek Campus Signal Timing
Infrastructure
Bidding
Greenwood Village, CO 80112

Arapahoe Road Traffic Signals Project
Infrastructure
Bidding
Greenwood Village, CO

Stop Bar and Advanced Detection for Signalized Intersections
Post-Bid
Centennial, CO

2021 Traffic Signal Structural Inspections
Post-Bid
Greenwood Village, CO

Wrong Way Driving Traffic Enhancements
Results
$1,000,000 to $5,000,000 est. value

Chambers Road and Innovation Way Traffic Signal
Results
CO

2021 Traffic Signal Rewire Project
Infrastructure
Post-Bid
Greenwood Village, CO

South Federal Boulevard and West Berry Avenue Pedestrian Traffic Signal SRTS
Results
Littleton, CO

2021 Traffic Signal Cleaning and Painting
Infrastructure
Post-Bid
Greenwood Village, CO

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

On-Call Traffic Engineering Maintenance Services
Infrastructure
Post-Bid

Aurora Signals 2019
Results
Less than $1,000,000 est. value

Traffic Control Services
Term Contract
Post-Bid
CO

On Call Traffic Signal (NPS) Operation and Maintenance Services
Alteration
Results
Englewood, CO

On-Call Automated Traffic Recorder Installation and Repair Services
Infrastructure
Post-Bid

Last Updated 02/11/2022 02:18 PM
Project Title

2022 Traffic Signal Replacement

Physical Address View project details and contacts
City, State (County) Littleton, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,525,174
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of twenty-two (22) traffic signal poles and mast arms including signal heads and signage, six (6) controller cabinet, six (6) pedestrian poles, and sidewalk / pedestrian ramp removals and replacements at Nine (9) intersections throughout the City of Littleton. The contract will be divided into 9 separate bid schedules to reflect the 9 different intersections where work will be completed. The bid schedules 1 – 3 are the base bid and include the intersections of Bowles and Coventry, Powers and Broadway, and Orchard and Broadway. The remaining intersections will be considered alternate bids.

Details

Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents